1RevisionLog.docVIP

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
1RevisionLog.doc

1 Revision Log 2 2 Responsibilities 2 3 Modifications to procedure 2 4 Tool box 3 5 Commissioning check list valve type: 01-6471-01/02/0300 4 6 Typical Handover Certificate 9 7 Cleaning of filters 10 7.1 Pressure regulator 10 7.2 Solenoid valve 10 8 Testing cylinder valve opening 11 8.1 Diverter valve system 11 8.1.1 Preparation 11 8.1.2 Verify 11 8.1.3 After verification. 11 8.2 Single area system 12 8.2.1 Preparation 12 8.2.2 Verify 12 8.2.3 After verification. 12 9 CE marking acct. pressure directive, PED: 13 9.1 Distribution piping downstream the restrictor 13 9.1.1 Category I Module A 13 9.1.2 Category II Module A1 14 10 Alternative pilot line test 15 10.1 Description of unit 15 10.2 Unit in use 16 Revision Log Revision Page, Section Description Date 0 All For Comments 2000.05.01 1 All For project use 2000.06.01 2 6,7,8, Updated 2000-11-07 3 24 Torque increased 2001.06.10 4 4, 8, 9 Acceptable pressures stated in step 1.EC declaration information. Alt. test and Control unit added 2002-08-10 5 Responsibilities It is the responsibility of the Design engineer in charge of a specific Argonite installation to ensure that the requirements listed herein are incorporated in the project documentation and that detailed information’s/procedures are made available to the commissioning engineer. Modifications to procedure Should the user at any point have comments or the like which could improve or clarify the content it would be appreciated if these comments are informed to the issuer Ginge-Kerr Danmark A/S on Fax. +45 36 77 22 31. Commissioning Procedures – Argonite system After completion of installation, the Argonite system should be commissioned by a Ginge-Kerr Commissioning engineer or a Ginge-Kerr certified Commissioning engineer. The enclosed Commissioning Checklist should as a minimum be followed in order to ensure the continued availability, safety and optimal efficiency of the system. In the period after the commissioning and hand over, it is re

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档