《已打印EMSI_LEED_GA Test-60-C》.pdfVIP

  • 10
  • 0
  • 约4.87万字
  • 约 27页
  • 2016-03-01 发布于河南
  • 举报
《已打印EMSI_LEED_GA Test-60-C》.pdf

Confidential LEED Green Associate Model Exam——C Part 2(51-100) Question 51 In an integrated design approach, when does the green building process end? A At the bidding phase B At the construction phase C At the design phase D At final occupancy Notes: Reference: Sustainable Building Technical Manual Part II l a i t The extra phases of green building beg

文档评论(0)

1亿VIP精品文档

相关文档