某小区生活污水中水回用处理____工程设计本科毕业论文.doc

某小区生活污水中水回用处理____工程设计本科毕业论文.doc

  1. 1、本文档共40页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
摘 要 目前由于需水量激增水资源的浪费和污染,水资源短缺的危机。 A Community Living In Sewage Water Treatment Project Designed To Use Abstract Contaminate at present since the water requirement increases sharply by and the water resource dissipation draws, water resource shortage crisis is very grave. Set up middle water using time being able to make use of freshwater resources and save effectively , cut down the filth , waste water discharging amounts , cut down water environmental pollution. Housing estate fundamental data in living combining with some , have made clear that water treatment returns to the necessity using a station in construction on the basis analysing foul water current situation discharged by housing estate carefully. According to project design demand, the queen reaches the result choosing by that water treatment returns to the analysis contrast using handicraft to currently various common middle, scheme having suggested that the handicraft applying CASS disposes of sewage, priority has set forth CASS handicraft principle and the process flow handling a domestic sewage and using time. Have waited for the concrete process design part to be in progress for the main parameter reaches the standard to realize housing estate foul water regenerating the degassing and pond for storing water making use of medicine , adding to the filth pump , CASS pool , quick filter chamber including a grille , adjusting pool , sneaking into in using foul water, detailed secretly scheme against. General flat surface arrangement and elevation arrangement standing according to that design philosophy and the norm accomplish sewage treatment, the personnel the reference relevance data has been carried out on to handling a station arranges and runs cost analysis, and safety at work waits for a problem to work out explanation right away. According to the engineering drawing designing that result is completed,be constuct with having provided the drawing sheet basis clear and definite to the construction

文档评论(0)

海纳百川 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档