ebox-2300_wifi_installation.pdfVIP

  • 3
  • 0
  • 约4.09千字
  • 约 12页
  • 2016-03-12 发布于山西
  • 举报
ebox-2300_wifi_installation

How to install a WiFi kit into an eBox-2300 Courtesy of: Jason Summerour Summerour Robotics Corp www.RoboticsC 10/15/2007 1 Copyright 2004-2007 Summerour Robotics Corp (www.RoboticsC) Here is a handy How-To to show customers how to install a WiFi Kit into an eBox-2300. 1. Remove four phillips head screws from bottom of eBox-2300 as shown: 2. Pry top off using wide flat head screw driver. You will want to place the head of the screwdriver between the top of the eBox-2300, and the CPU heat sink inside the eBox-2300, then pry. There is a very sticky heat transfer material that keeps the CPU in contact w/ the top of the eBox-2300 to transfer heat properly. This sticky material prevents the top from coming off easily. 2 Copyright 2004-2007 Summerour Robotics Corp (www.RoboticsC) 3. Here, you see the white heat transfer material that prevents the top from coming off. 3 Copyright 2004-2007 Summerour Robotics Corp (www.RoboticsC) 4. Remove the side casing from the eBox-2300 as shown. 5. Remove the hex bolts from the rear of the eBox-2300 as shown. There are six hex bolts total to be removed. 4 Copyright 2004-2007 Summerour Robotics Corp (www.RoboticsC) 6. Pick up on front of eBox-2300 motherboard, and slide it out as shown. NOTE: The motherboard actually fits over the round standoffs, so it is a tight fit. You’ll need to pick the board up slightly, then pull it out. 7. The motherboard won’t totally detach from the eBox-2300 chassis because of the power switch/wiring. While installing the WiFi Kit, simply lay the motherboard beside the chassis as shown. 5 Copyright 2004-2007 Summerour Robotics Corp (www.RoboticsC) 8. Insert mini-PCI WiFi card into the eBox-2300 motherboard at an angle, then s

文档评论(0)

1亿VIP精品文档

相关文档