- 1、本文档共90页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
本科毕业设计说明书
年产160万吨熟料舜岳水泥厂设计—重点设计:水泥粉磨
THE PRODUCTION OF CLINKER PER YEAR 1.6 MILLION TONS OF SHUNYUE FLY ASH CEMENT PLANT DESISN
—KEY DESIGN:CEMENT DESIGN
年产160万吨熟料舜岳水泥厂设计
THE PRODUCTION OF CLINKER PER YEAR 1.6 MILLION TONS OF FLY ASH CEMENT PLANT DESISN
—KEY DESIGN :CEMENT DESIGN
ABSTRACT
This design is in jiangsu, xuzhou TongShanXian which is to build a annual 1.6 million tons clinker cement plant. In the design process, I consulted a lot of cement plant design examples, and integrates theoretical experience data, but still have many shortcomings exist, please forgive me.
Briefly below the cement plant design processes of the shipunloaders.
First, the factory before choosing should be have a good site. Site choice reasonable or not will affect plant construction investment, investment production and future development. Therefore, the site selection should pay great attention to. Site choice work is a comprehensive work which need many related technical personnel to participate in, generally include: technical economy profession, the assembly drawing transportation professional, raw materials professional, mining professional and process engineering, waterway professional, environmental protection professional, electrical major, etc.
Next, I would like to make time layout. The stand or fall of plant layout will affect the cement production process. In layout design process needed to consider the factors, such as reasonable decorate, many economic optimum, compact structure, function modular, etc, which need to be aware of and wind factors. The reasonable layout requirements placed on the lower end of the wind stacking the edge, and factory should ensure the environmental health of the factory strictly.
Thirdly, I want to conduct process equilibrium calculation, including material balance, host balance and depositories balance. Among them material balance mainly through the calculation to determine all kinds of raw materials, fuel, mate
您可能关注的文档
- 南方夏大豆生育期结构与产量性状关系的研究大学生毕业论文.doc
- 南广铁路跨广州穗盐路斜拉桥施工_--组织设计.doc
- 南通市通州区东沙大桥及接线工程_--施工方案.doc
- 南阳防爆集团发电机项目二期工程施工_组织设计.doc
- 霓虹灯的plc程序设计--循环彩灯设计--论文.doc
- 年产2万吨碳酸二甲酯合成项目--初步设计--化工设计竞赛.doc
- 年产4万吨电解二氧化锰项目立项立项建设可行性研究论证报告.doc
- 年产4万异型石材制品和20万新型建筑材料建设项目投资立项立项建设可行性研究论证报告.doc
- 年产6万吨pvc精馏工段工艺设计大学生毕业论文.doc
- 年产8万吨丙烯腈废水处理工段的--初步设计本科生毕业论文.doc
文档评论(0)