gps控制网平差和布设原则.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Shenzhen plane Metro Line GPS Control Network and Accuracy Analysis [Abstract] The Shenzhen Metro Line a comprehensive introduction to GPS horizontal control network the layout options, including GPS control network Technology design, field observation, the baseline vector solver, control network adjustment and precision analysis and reliability of the inspection. At the same time on the metro GPS horizontal control network issues relating to the establishment of some suggestions. [Keywords:] baseline vector solver; network adjustment; accuracy of analysis; reliability test 1 an overview of the Shenzhen Metro aircraft Shenzhen Metro Line project began with the initial construction lines Hongling Road station, stop at Long Xing Street Station, along the route through the region by the east gate of Luau District, water, shellfish, Po Sam Area, Longing District, Fuji town, Hengyang town, Longing Town, Longing Central City, and. Line length is 32.91km, which places off the assembly line length 692km, overhead wire length 25.71km. Across the board established a total of 21 stations and a depot, in which cloth heart Hongling Road Station to Station 6 stations for underground stations, Fuji Street, Tai Kook Tzu, the Joint Inspection Station to Station 14 for high stations, Tong Hang semi-underground station. The project is located in Special Economic Zone across the board, especially in some of Hongling Road off the assembly line - Lao ,Cai - East Gate Road three points from the two districts, downtown commercial area through the East Gate Street, skyscrapers, streets are narrow with heavy traffic, urban radio interference seriously , to GPS measurement difficult. 2 GPS Control Network Design 2.1 The principle of cloth Network ?????? GPS Control Network for this project under the underground railroad, light rail traffic engineering measurement standards, City Survey norms and Global Positioning System Technical Specification for Urban Survey in the relevant technical

文档评论(0)

精品报告 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档