#矿业六矿井初步设计说明书 毕业论文.docVIP

#矿业六矿井初步设计说明书 毕业论文.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
#矿业六矿井初步设计说明书 摘 要:本次设计的沃溪矿区沃溪坑口位于#沅陵县城北东82km处,地处沅陵、桃源二县交界处 Abstract The design of Woxi Woxi pit mining area in Yuanling County in Hunan Province 82 km north-east, is located in Yuanling, Taoyuan County at the junction of two, it is a medium-sized state-owned enterprises and more metal, ore products primarily for gold, antimony , Tungsten ores. The design is divided into eight parts, namely: (1) General (2) deposit in the occurrence of natural profile and raw data (3) deposits, (4) Development System (5) mining methods; (6) mine ventilation; (7) mining and upgrading transport, (8) topics: Xiangxi Gold mine Woxi Review of the mining methods. According to the Hang Hau Woxi specific deposit, geological conditions, conditions of deposit exploitation of the mining methods used for hydraulic roof pillar wall caving. Wo Hang Hau River to its design production capacity of 180,000 tons / year, the choice of the method of mining ore recovery, the loss rate, poverty rate are as follows: 95%, 4%, 5%. Ventilation way into the central wind out of the two wings of the wind-back, more than 16 middle of a pioneering system Woxi Hang Hau open up the original system, as the design of deep (16 middle section below) using double-blind inclined development, transport used cars, upgrade a Series car upgrade. The design feature of the Western Hunan Gold Mine Woxi Review of gold mining method, first introduced nine kinds of mining methods and the development of mining technology and mining methods that the existing problems, then under the existing problems of rational use of mining methods and mining method Commentary on ways to improve. Key words: Geological; inclined pioneering double-blind system; pressure pillar for the top wall caving; mine ventilation; mine upgrade and transport; Review of the mining methods. 窗体顶端 窗体底端 目 录 第1章 总 论 1 1.1 设计指导思想 1 1.2 设计的基本要求 1 1. 3设计依据 1 1.4 沃溪矿区的整体概况 2 1.4.1 资源条件 2 1.4.2 外部运输、供水、供电条件 2 1.4.3 设计规模 3 1.4.4 服务年限 3 1.4.5开采方法 3 1.4.6

文档评论(0)

绿风 + 关注
实名认证
文档贡献者

教师资格证持证人

该用户很懒,什么也没介绍

领域认证该用户于2024年11月27日上传了教师资格证

1亿VIP精品文档

相关文档