余热锅炉安装作业指导书.docVIP

  • 10
  • 0
  • 约4.09万字
  • 约 41页
  • 2016-06-13 发布于江苏
  • 举报
CSPC NANHAI PETROCHEMICALS PROJECT 南 海 石 化 项 目 Work Instruction For HRSG Installation 余热锅炉安装作业指导书 版次 日 期 发布原因 编 制 审 查 QA 批 准 目 录 TABLE OF CONTENTS 1.工程概况PROJECT GENERAL DESCRIPTION 2.编制依据REFERENCES 3.职责RESPONSIBILITIES 4.施工准备PREPARATION FOR CONSTRUCTION 5.主要施工机械及工具MAIN MACHINES AND TOOLS FOR CONSTRUCTION 6.施工工序和施工方法WORKING PROCEDURE AND METHOD 7.工作安全分析(JSA) JSA-8560-8102-0101 JSA-8560-8102-0102 8.附录ATTACHMENT 工程概况Project General Description 1.1南海石化汽电联产项目余热锅炉由FOSTER WHEELER公司设计生产。该余热锅炉分为超高压和低压两个汽水系统,主要设备为模块式供货,两侧的墙箱分为26片,底部墙箱分为13片,顶部墙箱分为17片,受热面分为7个模块供到现场,另有超高压和低压汽包各一台。The heat recovery steam generator (HRSG) for the CSPC Nanhai project is designed and manufactured by Foster Wheeler Company. The HRSG comprises very high pressure and low pressure two steam-water systems. The main equipment is module supplied. The casing on both sides comprises 26 pieces. The floor casing comprises 13 pieces. The top casing comprises 17 pieces. The heat transfer equipment is supplied to the site by 7 modules. There is one set of very high pressure drum and low pressure drum respectively. 1.2该余热锅炉设计有烟道补燃系统,采用自然循环,选择性催化脱氮系统,模块设计为鳍片管形式。 The HRSG is designed as flues after combustion system and adopts natural circulation ,with a selective catalyst reduction system. The module is designed as the form of finned pipe modules. 1.3余热锅炉超高压系统产生的蒸汽汇入厂区超高压蒸汽母管,低压系统产生的蒸汽汇入厂区低压蒸汽系统。 The steam generated by HRSG very high pressure system converges into the very high pressure steam manifold in the plant area. The steam generated by the low pressure system converges into the low pressure steam system in the plant area. 编制依据References 2.1FOSTET WHEELER有关HRSG图纸 2.2《电力建设施工及验收技术规范》(DL/T5047-95锅炉篇) 《Technical Criterion of Electric Power Construction and Acceptance》(DL/T5047-95 For Boiler) 2.3《火电施工质量检验及评定标准》(1996版锅炉篇) 《Quality Inspection and Assessment Standard of Thermal Power Construction》(FOR BOILER CONSTRUCTION QUALITY[1996]NO.111)。 2.4《电力建设安全

文档评论(0)

1亿VIP精品文档

相关文档