网站大量收购闲置独家精品文档,联系QQ:2885784924

霍尔辛赫煤矿南二采区开采设计论文-本科毕设论文.doc

霍尔辛赫煤矿南二采区开采设计论文-本科毕设论文.doc

  1. 1、本文档共62页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
霍尔辛赫煤矿南二采区开采设计论文-本科毕设论文

摘要 本设计为霍尔辛赫煤矿南二采区设计,设计生产能力为前期2.4Mt/a,后期升之为3Mt/a,服务年限为9.22a。井田只开采3号煤层。采区平均东西长5.88km,南北宽2.66km,面积9.88k㎡。总的工业储量为66577kt,可采储量38731kt。采区煤层储量丰富,开采厚度平均5.8m(纯煤厚度5.5m),煤质较好,发育稳定,单层夹矸薄(0.2~0.3m),构造比较简单,煤层产状平缓,倾角一般在0°~ 5°左右。煤层顶底板岩层多为泥岩、砂质泥岩、粉砂岩、细砂岩等。由于采区内地面村庄密布,是影响井下开采方法选择的主要因素。为了尽量提高资源利用率,以及受煤层地质条件等其它因素影响,考虑以上诸多因素,经多方案比较后,决定本采区内采用常规综放和条带跳采采煤法开采,工作面全部为综合机械化采煤。采区内共有21个常规综放工作面和6个条带跳采综放采煤面。 关键词 : 采区设计 常规综放 条带跳采 综合机械化 ABSTRACT The design for the Second South Huo er xin he coal mining area design, the design of pre-production capacity of 2.4Mt / a, or as a late 3Mt / a, length of service for 9.22a. Mine is only on the 3rd coal mining. Mining area from east to west on average 5.88km, north-south width 2.66km, area 9.88k ㎡. The total reserves of industrial 66577kt, recoverable reserves 38731kt. Mining area rich in coal reserves, the exploitation of the average thickness of 5.8m (net coal thickness of 5.5m), coal quality is better, development of stable, single-layer thin tonstein (0.2 ~ 0.3m), a relatively simple structure, flat seam occurrence, the general inclination in the 0 ° ~ 5 ° or so. Seam roof and floor rocks are mostly shale, mudstone, siltstone, fine sandstone and so on. Mining villages in the region as a result of the ground covered, the impact of underground mining methods is a major factor in selection. In order to maximize resource utilization, as well as the geological conditions of coal by other factors, take into account the above factors, the multi-program comparison, we have decided to adopt the area of the conventional fully mechanized caving and strip mining coal mining jumped, all face integrated mechanized mining. A total of 21 mining area of conventional top-coal caving face and jumped six bands of fully mechanized caving coal surface mining. Key words: The design of mining area、Caving conventional、Jump strip mining、Integrated mechanization 目 录 摘要 iii ABSTRACT iv 第一章 矿井概况 1 第一节 矿井基本概况 1 第二节 矿井地质特征 7 第三节 矿井开拓概况 11 第二章 采区基本开采条件 17 第一节 采区基本条件

文档评论(0)

海纳百川 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档