gp2.3_rsources.v11.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
gp2.3_rsources.v11

GP2.3 – Provide Resources Practice ID GP2.3 Provide adequate resources for performing the PA process, developing the work products, and providing the services of the process. PII ID Direct Artifacts Indirect Artifacts Assessment Considerations General Evidence across PAs (Look Fors / Listen Fors) Documented process descriptions and plans (strategic or tactical) for performing the process, which include a characterization of resources needed. (Reference GP2.2) Evidence that adequate resources (funding, facilities, skilled people, tools, etc.) are actually provided as planned. Staffing profiles and labor reports showing effort spent on performing the process. Documented skill prerequisites for filling process roles and responsibilities, and evidence that assigned staff meet these criteria. Development environment and facilities (hardware, software, licenses, tools, labs, test equipment, etc.). Cost performance measures showing provision of funding in accordance with the plan. Analyses, reports, or metrics tracking availability of resources vs. plan. Ensure the resources necessary to perform the process as defined by the plan are available when they are needed. “Resources include adequate funding, appropriate physical facilities, skilled people, and appropriate tools.” “The interpretation of the term ‘adequate’ depends on many factors and may change over time.” Adequacy is subjective, and most likely determined through affirmations of sufficiency from those performing the work. Listen also for cases where the process failed due to insufficient resources. This may indicate weaknesses in the plan or in the implementation. Care should be taken in relying on affirmations of inadequate resources. A performer often wishes they had more time, money, or tools, but still has adequate resources to accomplish their planned tasks. Separate budgets are not needed for each PA; they may be distributed over several PAs. A key consideration is whether the manager of that process h

文档评论(0)

yuerang3062 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档