公路工程项目建议书的编制步骤.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公路工程项目建议书的编制步骤

公路工程项目建议书的编制步骤 篇一:公路工程项目建议书的编制步骤 nbsp; The proposed route scheme stretches 196.220 kilometers. The project adopts the bidirectional four-lane expressway with the design speed of 80 kilometers/h, the integral roadbed width of 24.5 meters and separated roadbed width of 12.25 meters. The main highway in the proposed route scheme designs 255 bridges that stretch 62656 meters (seven super-large bridges that stretch 13926 meters, 146 large bridges that stretch 45870 meters, and 102 small bridges that stretch 2860 meters), 340 culverts, 36 tunnels that stretch 23220 meters (six long tunnels that stretch 10770 meters, seven moderate-length tunnels that stretch 4780 meters and 23 short tunnels that stretch 7670 meters). There are also 11 exchange overpasses, 25 separated overpasses, 36 passageways and flyovers, two service zones, one main highway toll station and 11 ramp toll stations.nbsp; 1.4.5 Investment Estimation and Fund Raising 1. Investment Estimation Route K of the proposed route scheme demands a total investment of 13.910509 billion Yuan. It costs 70.892 million Yuan per kilometers, including Chienan fees of 10.059737 billion Yuan. That?s to say, every kilometer costs Chienan fees of 51.268 million Yuan.nbsp; 2. Fund Raising The capital funds occupy 30% of the gross investment of the proposed route scheme (not including loan interest in construction period) and the project owner is responsible for raise the capital funds. 65% of the gross investment is raised by means of domestic bank loans. According to latest regulation of Central Bank, interest rate of over-five-year loan amounts to 5.94% and the loan will be repaid in the form of expressway fees. 1.4.6 Implementation Scheme The proposed project stretches 196.220 kilometers. The design speed is 80 kilometers/h and roadbed width is 24.5 meters. The entire project will be started in 2011 and completed in 2013. The construction period lasts for three years. nbsp; 1.4.7 Economic Evaluation From the perspective

文档评论(0)

精品文档 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档