- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
宁武高速A3标临用地复垦方案
宁武高速公路A3合同段
临时用地复垦方案
编制:
审核:
审批:
中铁十七局集团有限公司
宁德宁武高速公路A3合同段项目经理部
二00九年八月二十五日
目 录
一、项目简介···············································2
二、复垦目标··············································2
三、复垦计划安排···········································2
四、临时用地情况及相应复垦方案····························3
1、大型临建用地··········································3
2、其它临时用地·········································4
五、其它主要保护预防措施··································6
1、组织管理措施·········································6
2、地表耕植层保护措施···································7
3、节约用地保证措施·····································7
4、预防土地破坏和环境保护保证措施·························7
5、复垦保证措施··········································8
6、质量保证措施··········································9
7、安全保障措施··········································9
临时用地复垦方案
一、项目简介
1、工程概况
宁武A3合同段位于宁德市福安康厝乡,起于红坪村(桩号YK45+480),终南洋村(桩号YK52+487)合同段路线全长7.035km,工程合同造价为3.35亿元,合同工期24个月。路基方119.78万m3m3,圬工3.12万m3;座桩基484根承台24个墩柱268个T梁902片,现浇梁一(25+32+25),悬浇梁(66+120+66)涵洞通道13座,588.5延米1座。爆破安全规程(GB6722-2003)
pump speed (c) is proportional. A, a party; B, the second party; C/third party. ... A, increasing amplitude increases with the increasing speed of b, the amplitude is independent of load amplitude decreases with the increase of load c, d, amplitude increases as the load when the static friction occurs when the turbo-generator shaft (b). A vibration phase angle is constant b changes, vibration phase angle is c, sometimes constant vibration phase angle and sometimes d, vibration phase angle start, later increased the load on the turbine swing value to a slow rate of speed control system (a). Inversely proportional to the proportional to a, b, c, a nonlinear relationship between d, independent of when the rotor critical speed lower than the speed (d) only when the oil film oscillation may occur. A, 4/5 b, 3/4 c, 2/3 d, at the sliding-parameter shutdown of 1/2, (c) steam turbine overspeed test. A, b, c after
您可能关注的文档
最近下载
- 2022年ECR ECN基础知识ppt课件.pptx VIP
- 2025年实验动物从业人员上岗证试题库+答案.docx
- 庄周梦蝶原文课件.pptx VIP
- 卧式储罐安装施工方案.docx VIP
- 二零二五版特种电缆定制与研发合作合同.docx
- 生长发育迟缓的诊断与干预.docx VIP
- 佳能 iC MF645Cx 645 彩色激光打印机中文维修手册.pdf VIP
- T_ZGCMITT 006.2-2022 介入诊疗服务质量评价 第2部分:介入诊疗技术规范.docx VIP
- SL 285-2020 水利水电工程进水口设计规范.pdf
- 2025年广州市花都区人民医院医护人员招聘备考试题及答案解析.docx VIP
文档评论(0)