液压静压高强预应混凝土管桩监理要点
pump speed (c) is proportional. A, a party; B, the second party; C/third party. ... A, increasing amplitude increases with the increasing speed of b, the amplitude is independent of load amplitude decreases with the increase of load c, d, amplitude increases as the load when the static friction occurs when the turbo-generator shaft (b). A vibration phase angle is constant b changes, vibration phase angle is c, sometimes constant vibration phase angle and sometimes d, vibration phase angle start, later increased the load on the turbine swing value to a slow rate of speed control system (a). Inversely proportional to the proportional to a, b, c, a nonlinear relationship between d, independent of when the rotor critical speed lower than the speed (d) only when the oil film oscillation may occur. A, 4/5 b, 3/4 c, 2/3 d, at the sliding-parameter shutdown of 1/2, (c) steam turbine overspeed test. A, b, c after taking safety measures, no d, lead on sliding-parameter shutdown process and after approval ratings down compared with (b). Capacity positive differential expansion of b, a, prone to the negative expand difference c, differential expansion does not change d, change little differential expansion turbine shutdown when the coastdown speed, due to the blast and Poissons effect, the rotor will appear (a) sudden increase. A, positive differential expansion of b, negative differential expansion of c, d, differential expansion mutation does not occur. Variable pressure operation of the unit, when the load changes, to (a) high-temperature components to changes in temperature. A and b increased c reduction, will not change d, the dramatic changes in the steam heat transfer between metal and larger metal parts caused by internal temperature (b). Greater the smaller the a, b, c, constant
液压静压高强预应力混凝土管桩监理要点
2007-09-25 20:41
广州市建发监理有限公司,广东 广州 511400)
【摘要】文章从监理工作实践中总结出液压静压高强预应力混凝土管桩监理要点,能从监理工作的事前、事中、事后详细分析和指点出监理工作的各个要点。
【关键词】特点及适用范围;相关标准及技术规范;监理控制
【中图分类号】TU71??????? 【文献标识】A
【
您可能关注的文档
- 浅谈铁路客运专线梁接触网基础及综合接地施工质量过程控制.doc
- 浅谈锦屏一级水电雾化区高边坡悬挑排架安全管理过程控制--陈鹏飞-字数5102-26.doc
- 浅谈静压预应力混土空心方桩在施工过程中的监理要点及其体会.doc
- 浅谈高层建筑安装程监理的质量控制.doc
- 浅谈高等级道路交施工的交通组织方法.doc
- 浅谈高速公路路基工放线(全站仪).doc
- 浅谈鲤城区城市化程中的社区建设与管理12.09doc..doc
- 浆砌片石挡土墙、坡施工组织设计.doc
- 浆砌片石挡土墙施方案(本项目).doc
- 浆砌重力式挡土墙工方案及工艺 开工报告.doc
- 2025-2026学年天津市和平区高三(上)期末数学试卷(含解析).pdf
- 2025-2026学年云南省楚雄州高三(上)期末数学试卷(含答案).pdf
- 2025-2026学年甘肃省天水市张家川实验中学高三(上)期末数学试卷(含答案).docx
- 2025-2026学年福建省厦门市松柏中学高二(上)期末数学试卷(含答案).docx
- 2025-2026学年广西钦州市高一(上)期末物理试卷(含答案).docx
- 2025-2026学年河北省邯郸市临漳县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省石家庄二十三中七年级(上)期末历史试卷(含答案).docx
- 2025-2026学年海南省五指山市九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省唐山市玉田县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省邢台市市区九年级(上)期末化学试卷(含答案).docx
最近下载
- 05G359-3悬挂运输设备轨道标准图集.pdf VIP
- 新学期教师培训会,校长发言:明边界守初心,知尺度有温度,让教育履职既合规又暖心.doc VIP
- 湖南省长沙市第一中学2024-2025学年高二上学期语文1月期末考试试卷(含答案).pdf VIP
- 2025年秋季学期学校全面工作计划.doc VIP
- T∕CHAS 10-2-22-2023 中国医院质量安全管理 第2-22部分:患者服务 疼痛治疗.pdf
- T_CNFMA B036-2024 户外林业机械 以锂离子电池为动力源的步进式松土机.pdf VIP
- T_CCTAS 237-2025 城市轨道交通市域快线车辆运营技术规范.pdf VIP
- 广告策划与创意(第2版):网络广告创意PPT教学课件.pptx
- 人体解剖学试题及答案.docx VIP
- 最后倒计时最后倒数(The Final Countdown) 高清钢琴谱五线谱.doc VIP
原创力文档

文档评论(0)