- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
株洲航电枢纽工程-土地拆迁移民安置
Farmland Protection Works in Zhuting Region
Scheme
Zhutinggang, the primary tributary of Xiangjiang river, lies on the right bank of the river course, 38km far from the dam site. The catchment area covered by Zhuting sluice has a collecting area of 389km2. The reservoir inundation to be resulted from the Project, below normal storage level, will affect 2066Mu of farmland in 4 villages of 2 counties.
The design herein is conducted based on the comparison and selection between such two alternatives as hightening and pump draining plus hightening partly. The hightening alternative is that the farmland above El.38.5m is to be hightened to design elevation, to realign brooks and, to reconstruct Zhuting sluice. The pump draining plus hightening partly alternative is that, considering present situation of farmland to be inundated in Zhuting region, a large part to be inundated within protected scope of original dyke is to be treated by means of pump draining in combination with brooks realignment as well as the part above El.38.5m in the remainder to be hightened to design elevation, furthermore, Zhutinggang river is to be retreated. Based on comparison, pump draining plus hightening partly alternative is established as recommended scheme herein.
Procedures and Layout of Works
All curved reaches of brooks within protected scope of original dykes are to be straightened to replace the curve. Dykes will be reconstructed and newly established along the brooks adjacent to pump draining area. Pump stations and cut-off ditches will be provided in protected region, where the seepage and water log will be drained out by pump stations hereof. Original dyke will be consolidated. Then following the principle of hightening farmland, remaining farmland with elevations varying from El.38.5m to El.41.0m (exclusive of that at El.41.0m) will be hightened to El.41.0m generally, original roads (including bridges) and the channels net for irrigation and drainage will be restored adeq