- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公司开业庆典董事长致辞范例
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 公司客户经理竞聘演讲稿.doc
- 公司客户经理竞聘演讲稿范文.doc
- 公司客服个人工作总结400字.doc
- 公司客服人员半年工作总结600字.doc
- 公司客服年总结范文400字.doc
- 公司客服月度总结模板.doc
- 公司客服部一周工作总结.doc
- 公司宣传个人工作总结结束语.doc
- 公司宣传策划部员工年终总结.doc
- 公司宣传策划部员工年终总结范文.doc
- 纺织服装策略:穿透周期迷雾,精准锁定高回报优质资产.pptx
- 冬去春临:AI繁花竞绽,数据硕果盈枝,可控链浪潮奔涌向新程.pptx
- 化工行业策略:行业筑底蓄势待拐点,精准捕捉结构性改善赛道与高成长标的投资契机.pptx
- AI引领时代红利,设备更新促顺周期提前启幕——机械行业策略全景解读.pptx
- 半导体行业策略:消费电子芯片热度不减,存储周期开启强劲上行通道.pptx
- AI赋能:驱动电子行业加速复苏与硬件创新升级.pptx
- 电动车行业策略:政策红利加速释放,中游盈利筑底反转,把握结构性机遇.pptx
- 传媒互联网行业策略报告:消费理性化浪潮下,AI赋能时代正式开启.pptx
- 电动车行业策略:需求与排产共振,锂电拐点确立,布局高确定性龙头.pptx
- (5篇)纪念中国人民抗日战争暨世界反法西斯战争胜利80周年心得体会范文.doc
最近下载
- 12 全国生态环境监测专业技术人员大比武理论试题集 第十二章 综合分析 .pdf VIP
- GB51004-2015建筑地基基础工程施工规范.doc VIP
- 致敏物质控制措施检查记录表.docx VIP
- 智慧水利大数据信息化集成服务平台建设综合解决方案.docx VIP
- 城市公共交通规划与运输(1).pptx VIP
- 14 全国生态环境监测专业技术人员大比武理论试题集 第十四章 理论考试试题真题 .pdf VIP
- 2023年南宁市青秀区总工会招聘考试真题.docx VIP
- 烟淄管道干线扩能改造工程 环境影响报告书.pdf VIP
- GB50391-2014:油田注水工程设计规范.pdf VIP
- 资源管理平台系统-技术方案.docx VIP
文档评论(0)