- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
关于建党94周年的思想汇报范文
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 关于女生节的活动方案.doc
- 关于女生节的活动策划书.doc
- 关于如何写好学术论文.doc
- 关于如何制定学习计划.doc
- 关于学习十八届三中全会的思想报告范文.doc
- 关于学习的演讲稿开场白.doc
- 关于学习的演讲稿开头.doc
- 关于学习的演讲稿格式.doc
- 关于学习的演讲稿素材.doc
- 关于学校中层干部竞聘演讲稿范文.doc
- 2025年西北民族大学科研助理招聘笔试高频难、易错点备考题库及答案详解1套.docx
- 2025年辽宁工程技术大学赴高校现场招聘10人笔试高频难、易错点备考题库附答案详解.docx
- 2025年黑龙江省交通运输厅所属事业单位招聘125人笔试高频难、易错点备考题库及答案详解1套.docx
- 2025年贵州省市场监管局所属事业单位招聘39人方案笔试备考题库附答案详解.docx
- 2025年贵州安顺市平坝第一高级中学免费师范生及高层次人才引进笔试高频难、易错点备考题库及答案详解1.docx
- 上海社会科学院工作人员招聘34人笔试备考题库及答案详解一套.docx
- 2025年贵州纳雍县事业单位第二批招聘176人笔试高频难、易错点备考题库及答案详解1套.docx
- 2025年贵州省体育局直属事业单位招聘18人方案笔试高频难、易错点备考题库及参考答案详解.docx
- 2025年首都医科大学脑重大疾病研究中心(北京脑重大疾病研究院)招聘3人笔试高频难、易错点备考题库及.docx
- 2025年芜湖市引进党政储备人才54人笔试备考题库带答案详解.docx
文档评论(0)