- 1、本文档共2页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
医院麻醉科医生个人2015年底工作总结
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 医院统计工作计划例文.doc
- 医院网络部年终工作总结.doc
- 医院职工个人工作总结1000字.doc
- 医院肿瘤科实习报告.doc
- 医院节能减排2014年工作总结及2015年工作计划.doc
- 医院药师2016年度总结范文.doc
- 医院药师年底个人工作总结例文2015.doc
- 医院药师年度工作小结范文.doc
- 医院药师年终个人工作总结2015.doc
- 医院药师年终工作总结范本2015.doc
- 北师大版(2019) 必修第三册 Unit 7 Art Lesson 1 Masterpieces课件(共20张).pptx
- Unit 5 Music Reading and Thinking 课件-(共26张PPT)人教版(2019)必修第二册.pptx
- Unit 11 Conflict and Compromise 课件(共16张PPT,内镶嵌音频)北师大版(2019)选择性必修第四册.pptx
- Unit 6 Disaster and hope 课件(共19张)外研版(2019)必修第三册.pptx
- Unit 5 The Value of Money Reading and Thinking 课件(共23张PPT,内镶嵌视频)人教版(2019)必修第三册.pptx
- 北师大版(2019) 必修第三册 Unit 7 Art Lesson 2 Beijing Opera课件(共18张,内嵌音频).pptx
- Unit 7 第1课时(Section A 1a-1d)内嵌音视频课件 2025-2026人教版英语七年级上册Unit 7 Happy Birthday!.pptx
- Unit 7 When Tomorrow Comes Section A Grammar Focus—3c课件(共25张PPT)人教版英语八年级上册.pptx
- Unit 6 Seasons Integration 课件 度译林版英语八年级上册.ppt
- 人教版(2019) 选择性必修第四册 Unit 1 Science Fiction Reading and Thinking课件(共20张PPT)36.pptx
文档评论(0)