- 1、本文档共2页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
学习党的群众路线教育实践活动心得体会2014
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 委托聘请外教合同样本.doc
- 委托设计合同格式.doc
- 委托证明范本 三篇.doc
- 委托购房合标准样本.doc
- 委托贷款协议书范文.doc
- 委托贷款协议书.doc
- 委托贷款合同样本.doc
- 委托贷款合同(影视剧摄制).doc
- 委托选矿加工合同范本.doc
- 委托食品加工合同模板.doc
- 2023年甘肃省陇南市礼县永兴乡招聘社区工作者真题带答案详解.docx
- 2023年甘肃省陇南市礼县永兴乡招聘社区工作者真题带答案详解.docx
- 车用液晶显示器生产线项目立项报告.docx
- 电子器件关键材料研发基地项目可行性研究报告申请报告案例.doc
- 《医疗器械制造企业质量管理体系构建与质量管理跨组织战略实施》教学研究课题报告.docx
- 电子绝缘胶带生产项目可行性研究报告申请报告.doc
- 高中人工智能教育课程与地理信息系统在环境监测中的应用与教学实践研究教学研究课题报告.docx
- 5 《项目式学习在高中物理课堂中的教学效果评价体系构建研究》教学研究课题报告.docx
- 高中校园水电管理信息化与节能减排效果分析教学研究课题报告.docx
- 《海绵城市建设中城市道路雨水收集与利用技术的雨水收集系统与城市可持续发展战略协同研究》教学研究课题报告.docx
文档评论(0)