- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
政府项目员半年工作总结600字
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 政府文员实习周记范文.doc
- 政府机关十八届三中全会工作总结.doc
- 政府机关单位实习鉴定范文.doc
- 政府机关司机个人工作年度总结.doc
- 政府机关实习总结.doc
- 政府机关实习总结模板.doc
- 政府机关宣传部9月月度工作总结.doc
- 政府督查督办第一季度工作总结700字.doc
- 政府督查督办第一季度工作总结900字.doc
- 政府科员工作总结.doc
- 2025年工业互联网平台网络流量整形技术产业应用与市场前景报告.docx
- 工业互联网平台与5G通信模组2025年适配性发展趋势研究报告.docx
- 医疗与医药行业:精准医疗在肿瘤治疗中的应用与挑战分析.docx
- 2025年游戏化营销在电子竞技领域的应用与传播效果研究报告.docx
- 肿瘤精准医疗在结直肠癌放疗计划优化中的应用现状与未来展望报告.docx
- 2025年环境监测物联网在生态修复工程中的应用与发展报告.docx
- 2025年新型建筑保温材料行业市场趋势与政策分析报告.docx
- 细胞治疗产品临床试验审批流程中的临床试验监管机构报告.docx
- 2025年船舶制造订单市场分析报告:高端船舶技术创新方向.docx
- 2025年跨文化交流能力培养与跨文化教育国际合作研究报告.docx
文档评论(0)