- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
毕业生自我鉴定1000字_0
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 毕业生土建工程师个人实习总结报告.doc
- 毕业生在检察院实习报告.doc
- 毕业生外贸业务员实习报告精品.doc
- 毕业生外贸业务员实习报告.doc
- 毕业生外贸跟单实习周记.doc
- 毕业生大学自我鉴定.doc
- 毕业生学校行政管理实习报告范文.doc
- 毕业生学校财务实习报告5000字模板.doc
- 毕业生实习协议.doc
- 毕业生实习单位意见及考核评语.doc
- 高中生在数字化教学环境下的文化适应性与本土化评价方法对策研究教学研究课题报告.docx
- 2025年文创IP衍生品市场消费行为分析报告.docx
- 小学科学教师教学风格与学生科学探究精神培养的实证研究教学研究课题报告.docx
- 2025年航空物流产业低空经济潜力与发展策略深度分析报告.docx
- 小学语文阅读教学中的主题阅读与跨学科整合研究教学研究课题报告.docx
- 中药现代化企业竞争力评价报告:2025年国际市场拓展策略.docx
- 2025年美妆集合店行业创新与业态升级研究报告.docx
- 2025年数字化教学资源在文化创意产业职业技能培训中的创新应用.docx
- 加强奶牛养殖管理提高生产效率.docx
- 2025年航空航天行业头部企业增长模式创新报告.docx
文档评论(0)