- 1、本文档共2页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电子商务本科毕业登记表自我鉴定
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 电子商务专业毕业生实习日记.doc
- 电子商务专业毕业生求职优秀自荐书.doc
- 电子商务专业毕业生求职自荐书.doc
- 电子商务专业毕业生求职自荐书范文.doc
- 电子商务专业毕业生求职自荐书范文赏析.doc
- 电子商务专业求职信格式.doc
- 电子商务专业求职简历范文.doc
- 电子商务专业求职自荐信1000字.doc
- 电子商务专业的简历表格模板赏析.doc
- 电子商务专业简历模板赏析.doc
- 整本书阅读《西游记》(教学设计)七年级语文上册(统编版2024五四学制).docx
- 第33讲 古代的非洲与美洲(课件)高三统编版(2019)必修中外历史纲要下一轮复习.pptx
- 第九课 全面推进依法治国的基本要求(课件)高考政治一轮复习必修三《政治与法治》.pptx
- Unit 7 课时3 Section A (Grammar Focus) 语法课课件-七年级英语上册(人教版2024).pptx
- 5.1自然环境的整体性(第2课时)(课件)高二地理(人教版2019选择性必修1).pptx
- 5.5.3一元一次方程的应用——销售问题、分段问题、方案问题(课件)七年级数学上册(浙教版2024).pptx
- 1.2.1 倒数(课件)-六年级数学上册(人教版五四制2024).pptx
- 基础实验5 常见金属的物理性质和化学性质(课件)九年级化学上册(沪教版2024).pptx
- 第三单元 经济全球化(课件)高考政治一轮复习(新高考通用).pptx
- 5.1 地表环境的差异性(课件)高二地理(鲁教版2019选择性必修1).pptx
文档评论(0)