- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
试用期工作总结范文格式
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 试用期个人工作总结模板范文.doc
- 试用期个人的自我总结范文1500字.doc
- 试用期个人自我鉴定范文.doc
- 试用期会计人员实习总结.doc
- 试用期会计人员实习报告.doc
- 试用期会计人员实习报告范文.doc
- 试用期会计人员实习报告范文500字.doc
- 试用期会计工作总结报告.doc
- 试用期出纳实习周记20篇.doc
- 试用期员工个人工作总结范文.doc
- 聚焦2025年:体育赛事赞助策略报告——品牌推广的五大关键要素.docx
- 2025年能源产业碳捕获与封存技术应用产业链创新驱动与发展策略研究报告.docx
- 城市公共卫生设施2025年建设成本与社区稳定风险预测报告.docx
- 工业互联网平台同态加密技术在工业数据共享中的风险与机遇报告.docx
- 元宇宙2025年大数据存储需求分析与市场规模增长预测报告.docx
- 2025年废旧电子产品回收网络构建与无害化处理技术创新报告.docx
- 2025年在线教育平台教学质量提升中的学生支持服务策略报告.docx
- 5G商用深化背景下,2025年边缘计算在智慧交通市场前景分析报告.docx
- 聚焦2025年:全球创新药研发临床试验设计与数据分析报告.docx
- 聚焦2025年:全球创新药研发市场增长动力与瓶颈分析报告.docx
文档评论(0)