- 3
- 0
- 约9.95万字
- 约 3页
- 2017-04-29 发布于贵州
- 举报
试用期满实习报告范文
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
最近下载
- 施工现场各类设备机械安全监理实施细则(参考).doc VIP
- 华东交通大学2015-2016第一学期电牵专业《电机与拖动》期末A卷.doc VIP
- 储气罐专业定期检查表.docx VIP
- JB_T 14788-2024《连续延伸带式输送机》.pdf VIP
- GB 265-1988 运动黏度.pdf
- 山东省青岛市胶州市2024-2025学年七年级上学期期末历史试题(含答案).pdf VIP
- 基于概念整合理论研究母语对二语写作的影响-外国语言学及应用语言学专业论文.docx VIP
- 中国旅游地理第四章旅游区划.ppt VIP
- 《陆上风力发电机组钢混塔架施工关键材料技术规程》.pdf VIP
- 2025年AI图像识别服务合同协议合同.docx VIP
原创力文档

文档评论(0)