- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ANGUI-ORG-IEC60065.ppt
Assessor’s guide to IEC 60065 Northbrook, USA – 2006-05-03/04 Bob Burek Sr. Staff Engineer Contents Pre-audit preparation How many of you will be assessors for TRON? Occasionally you’ll be assessing categories not in your scope. Ask an expert in that standard which tests are essential, or require a thorough understanding of that type of equipment. Pre-audit preparation Confirm edition of the standard IEC 60065 7th Edition (2001) Amendment 1 (2005) IEC 60065 6th Edition (1998) Review the NCB/CBTL’s completed Operational Documents equipment list for TRON other categories. The CTL equipment lists aren’t always current with the latest edition or amendment of the standard. Determine what other equipment is needed for the editions in the CBTL’s scope. Normative Annexes are often forgotten! If this is a reassessment, look at previous assessment report. Pre-audit preparation Determine tests to witness Will vary depending on number of categories in CBTL’s scope. Kill two or more birds with one stone: It is uncommon for TRON will be assessed by itself. Pick tests such as Operating (Working) Voltage (13.2), Surge test (10.1 14.1a)), Resistance to Fire (20, also Annex G). Specialized Tests Bump test (12.1.1), Vibration test (12.1.2). Discuss tests other preliminary findings with Lead Assessor. You don’t have time to do everything! Think ahead on the important things you wish to see, given the time you have. Discuss this with the Lead Assessor. Contents Initial tour of laboratory Distribution type of power in the lab. Ambient temperature and humidity: how is it controlled and documented? Location of test equipment fixtures: do the locations of the test equipment appear to be credible for the test? For example, does the bump test equipment appear to be used frequently? Applies to all apparatus 7 kg, so it should be. Initial tour gives you a good idea of what types of apparatus are tested, allows you to ask some questions. Then you
您可能关注的文档
- 电子商务培训平台.doc
- 世贸组织的基本原则 高中政治必修1ppt课件.ppt
- 程序设计基础内部讲义.doc
- 电动力学课件3-1静 磁 场.ppt
- 大学物理自编题解答.doc
- 吴文虎《程序设计基础第2版》PPT-08.ppt
- 大学物理-多媒体课件 -第05章 刚体的定轴转动.ppt
- 中国外交进入3.0.doc
- 2016电子技术课程设计.docx
- 大学物理第四章__振动.ppt
- 小学英语课堂智能设备辅助下的多设备协同学习效果评价教学研究课题报告.docx
- 2025-2026学年初中信息技术(信息科技)第四册北京版(2013)教学设计合集.docx
- 2025-2026学年初中信息技术(信息科技)七年级下册清华大学版(2012)教学设计合集.docx
- 2025-2026学年初中信息技术粤教清华版九年级上册-粤教清华版教学设计合集.docx
- 2025-2026学年初中历史世界历史 第二册统编版(五四学制)教学设计合集.docx
- 合成数据隐私泄露风险、监管难题与对策研究.docx
- 网络犯罪治理协同机制困境与优化策略研究.docx
- 数据权益法中公益诉讼赔偿标准的司法实践问题与发展建议.docx
- ESG背景下的绿色风险管理与自然保护立法研究.docx
- 矿井安全监测系统的智能化运维管理机制.pptx
文档评论(0)