重庆松藻煤电公司渝阳煤矿课程设计研讨.doc

重庆松藻煤电公司渝阳煤矿课程设计研讨.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
重庆松藻煤电公司渝阳煤矿课程设计研讨

重庆大学本科学生毕业设计(论文) 松藻煤电有限责任公司渝阳煤矿 (600Kt/a)矿井初步设计 学 生: 学 号: 指导教师: 专 业:采矿工程 重庆大学资源及环境科学学院 二〇一四年六月 Graduation Design(Thesis) of Chongqing University Preliminary Design(600kt/a)for The First Coal Mine of Yuyang in Songzao Coal-Electricity Limited Liability Company Undergraduate: Liu Zhongwen Supervisor: Prof. Ge Zhaolong Major:Mining Engineering College of Resources and Environmental Science Chongqing University June 2014 摘 要 本次毕业设计的内容为松藻煤电有限责任公司渝阳煤矿(60万吨/年)初步设计。该矿井可采煤层M7、M8层,为近水平煤层,平均倾角°,回采工艺设计煤层为M8。此次设计以渝阳实际开发利用方案为基础,根据井田地质条件及煤层赋存条件,对该井田进行了初步设计。本次设计中,提出了四种开拓方案,结合矿井实际情况并经过技术经济分析比较,最终选定矿井的开拓方式为斜井、平硐综合开拓。井田划分为三个开采水平,即+350m水平、+150m水平和-100m水平。+350m水平按上、下山开采方式布置采面,开采+350m水平以上的煤层,共划分为南区、区个+150m~+350m的煤层,共划分为北区、东二区、东区三个带区;-100m水平,开采+150m水平以下的煤层,共划分为区、区个~保护层开采超前突出煤层一个。00kt/年 ABSTRACT Yuangyang in Songzao Coal-Electricity Limited Liability Company. There are two coal seams in this mine. They are all horizontal seams, and the average angle of them is 8. According to the geologicl conditions and occurrence conditions of coal seams, the preliminary design for the mine field isdone based on the actual development and utilized scheme for the first coal mine of Yuyang. In this design, I put up four plans, and at last I selected the combined development method with inclined shaft-shaft according to the analysis. The coal mine is devided into three working levels, +350m +50m and -100m. Working faces are arranged with upward and downward mining method in the +350m working level, which is devided into South No.1 Panel, South No.2 Panel and North No.1 Panel, North No.2 Panel , to exploit the coal seams above +350m. While in the +150m working level, which is devided into North Panel, East No.1 Panel and East No.2 Panel, working faces are arranged with upward mining method to exploit the coal seams between +150m and +350m .While in the -100m working level, which is devided into East No.3 Pa

文档评论(0)

ddf55855 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档