APQP Training November 2011.ppt

  1. 1、本文档共84页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
APQP Training November 2011

When PPAP is required is defined in Section I.3 of the PPAP Manual (starting on page 11) - customer notification required. Default level for raw material is 4 PPAP package forms, checklists, charts, capability analysis, measurement analysis included in PPAPall in an Electronic Format Discussion: Analysis and use of data. Corrective Action Continuous Improvement From the APQP and Control Plan manual, and from our discussion thus far, we know that these four ‘documents’ are required. We should also by now understand that these can be looked at as ‘elements’ where each is not a discrete document. When looking at one of these required ‘documents’ in terms of it being an element (as opposed to a discrete document) we have to look at each and determine what the specific requirements are for it. As with the control plan example on the next slide, there is a ‘minimum’ content required for each element. This diagram is another way to illustrate several developmental / critical paths of the main documentation requirements. As we discussed earlier, the APQP and Control Plan manual represents these as different, discrete documents. However, one should look at them as ‘element’ requirements. In the Ford DCP the process control plan ‘element’ is in the same document as the process FMEA ‘element’. None the less, the critical path rules still hold true. For example, in the DCP the control plan ‘part’ cannot be completed until the FMEA ‘part’ is completed. As we started to look at on the previous page, it is evident that the process flow diagram be ‘completed’ early. This is because it serves to identify all processes involved from which internal critical (special, whatever) characteristics are derived. I have only seen a couple of companies which got through a QS audit with NO internal critical / special characteristic. The above illustration shows the internal links in these documents which key each to the other. Note that the design FMEA does not have an internal link

文档评论(0)

sb9185sb + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档