- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
the earthwork digging filling
the earthwork digging filling
A. construction survey
Before centerline measurement on the ground, to the design and survey departments to pile, construction units and handover pile formalities, such as the original test pile lost or tilted to patch correction; Corner points pile and direction to pin point online peripheral and make good marks. Linear part every 500 ~ 1000 m to set the direction pile.
Along the center line for level measurement to check the ground elevation and the original level elevation, to carefully review standard basis points, such as finding level basis points, elevation when in doubt, in addition to the query in a timely manner to the design unit, in order to make the construction is not affected, every two leveling points can be used as a ring closure measurement, make sure the height difference of two points. Allow the closure of this at both levels to within + / - 12) L (mm) (as the horizontal distance between two points (L).
Reiteration route main control points and control construction, road center line, line and elevation survey, are recorded in the measuring form, and send supervision engineer for approval.
B. site preparation
For construction use of land within the scope of the plants, garbage, cleaning of organic impurities, dug in addition to the treatment and the original ground within the scope of the top 10 cm turf and surface soil to root out. Surface water and groundwater, the temporary water pump will MingShui smoke outside the scope of construction, maintenance, protection and pay attention to the temporary drainage unblocked.
C. depression treatment
According to the drawing requirements, construction of water depressions, pits, desilting to undisturbed soil first, and then construct 60 cm freestone, thickness of each layer of 30 cm or less, freestone maximum diameter of 30 cm or less, paving rubble to neat pattern, and empty cant drive, and 1 ~ 2 cm gravel filling and seaming, rolling compaction. Then using stratifie