半导体器件封装测试厂建设项目FM损管稽核报告.docVIP

  • 2
  • 0
  • 约2.95千字
  • 约 3页
  • 2017-06-08 发布于河南
  • 举报

半导体器件封装测试厂建设项目FM损管稽核报告.doc

半导体器件封装测试厂建设项目FM损管稽核报告

FM Review Macro Items and Notes 12 May 2011 Overview and Coordination items to be discussed. Pipe Rack Support Design and Specification. Support, Hanger, and Bracing Detail Documentation. Discuss flexible connections between buildings. Water Systems SD FM Approved items to be listed on the drawing. B3 requires Dedicated Diesel Pump Controller – Controller and Pump must be FM Approved Drawing SD2.26 . Central Utility beam structure see structural drawings JG2.5, 2.6, 2.7 : coordinate with Structural design for installation of sprinklers SD2.16, SD2.17, SD2.18 . Spray pattern must be considered. Seismic Bracing on main sprinkler lines on drawings SD1.2 and SD1.4. Valve arrangement too complicated Drawing SD2.26 . Please discuss how system works. Recommendation: Eliminate exhaust valves on B-1, B-3, and A-1 pumps. Excess pressure relief valves on A-1 Does not have piping to tank. “T” and reduce excess pressure relief valves from 2 to 1 and back to tank. Eliminate test valves on A-1’s. Relocate valves on discharge side of the reset to the “future building” risers. Delete test valve on B-2. Delete isolation valves between B-1 and B-2, and between B-2 and B-3 discharge lines. Separate discharge lines back to cistern for test valves and excess pressure relief valve. IR will purchase excess pressure relief valve with diesel pump package. FM will review hydraulic calculations for system. If valves on discharge side are required by code, relocate valves in f above to future building. Extend future riser lines to column F-1 on drawing SD1.5. Seismically brace along column lines with 12 meter spacing. SD2.18 Extend sprinkler test drainage line to ground level discharging to outside of building. Add sprinkler head in MIS room. The seismic bracing should be provided at the fire protection system. Sprinkler System of Utility Building Seismic protection including clearance, flexible couplings and earthquake bracings should be provided per FM Data Sheet 2-8 “Earthquak

文档评论(0)

1亿VIP精品文档

相关文档