不压井修井作业起下管柱装置设计与分析.docVIP

不压井修井作业起下管柱装置设计与分析.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
不压井修井作业起下管柱装置设计与分析

论文题目 不压井修井作业起下管柱装置 设计与分析 摘 要 传统的修井作业影响油气资源的可持续发展,这就迫切需要我们用一种全新的方式来对待井下作业,即保护井内的油气层,不压井作业技术能很好地满足这一要求。目前我国大部分油气田已进入中后期开采阶段The sustainable development of oil and gas resources has been influenced by the tradition well workover, which is urgently needed a new way to handle downhole servicing operation. The protection of hydrocarbon reservoir, snubbing technology can meet the requirement. At present, in our country, the majority of oil-gas fields has been in the middle and later mining stage. The rework operations has become more and more arduous, which is ensured that the oil-gas well normal production. The tubing string or rod string operation is an important part of downhole remedial operation. Because of the foreign snubbing technology is on the confidentiality, domestic snubbing technology has just started, so, it is a vital practical significance to further study and developement snubbing technology. This paper is according to the actual situation of our countrys oil-gas field. From the several aspects studying, fulfilling the snubbing?device?design and analysis: 1) By using an independent hydraulic control systemr, two levels of multi-hydraulic cylinders operating tubing string, thus, achieving a longer stroke, larger load snubbing device. 2) By using two groups of moving slips, the hydraulic pressure drive method, making the operating speed to be quick, the efficiency is high, and reducing the wellhead operating workers’ labor intensity. 3) By using hydraulic ball blowout preventer and hydraulic ram blowout preventer constituent the well head sealing system is more reliable while tubing string operation. 4) On the basis of theory, by using finite element analysis software ANSYS, calculated the mechanical properties of the main parts of slips, and examined the derrick structure of static and dynamic characteristics. Through designing and analysis, the snubbing device has been designed in the

您可能关注的文档

文档评论(0)

jiqinyu2015 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档