- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
mud flowline and trip tank计量罐甲方要求
Trip Tank SUBCONTRACTOR WILL provide, as part of the Rig Equipment, A Trip Tank that contains the Minimum Design Requirements shown below:
The Trip Tank WILL have a minimum of Two Compartments; having a minimum capacity of 40 bbl 20 barrels each compartment . Each compartment WILL be equipped with
a float-type
internal graduated volume marker readable in 1/2 bbl increments at the tank site, and
an air or electrical Tank Volume Totalizer system with remote volume read-out and recording devices located at the Drillers Console and in the Company Representatives office.
Two centrifugal pumps, each capable of pumping a minimum of 4 BPM of freshwater 8.33 PPG Mud with 30 of Head to the BOP Stack Bell Nipple, WILL be installed. This pump capacity MUST be confirmed and demonstrated prior to drilling.
The Centrifugal Pump Discharge s WILL be connected to both
the Rigs mud tank using a 2 ID minimum size line, and
the Bell Nipple using a 3 ID minimum size steel line.
A 4 ID minimum size line WILL be used to allow mud returns from the Bell Nipple Flowline, to be returned to the Trip Tank for measurement.
A 2 ID minimum size steel line WILL be provided to flow mud from the choke manifold into the Trip Tank.
Fill-up lines, from the Rigs mud pumps, WILL be provided to allow selective filling of each Trip Tank compartment. Yes, As required the capacity of trip tank is 56.6bbl,two compartments 28.3bbl each compartment Trip Tank
SUBCONTRACTOR’S TRIP TANK DESIGN CONFIGURATION
Three are two trip pumps, two trip pumps are the parallel connection and any one can be a spare one if one trip pump has any problem. The trip suction mud from trip tank and transfer to the well by hose. When tripping out the hole, the trip pump can fill the well, when need fill mud into trip tank, we can use weighting pump to pumping mud from other tank through low pressure hoses. Mud Flowline and Downcomer SUBCONTRACTORs Flowline WILL be Flanged or Welded and of Sufficient Size, Slope, and Design
您可能关注的文档
最近下载
- 初中综合实践活动教学设计 种植花生.docx VIP
- 医疗废物分类管理.pptx VIP
- 塔吊信号工试题及答案.docx VIP
- 2025《某大学10KV变电所供配电系统电气设计报告》19000字.docx VIP
- DZT 0295-2016 土地质量地球化学评价规范.pdf VIP
- 运输过程中出现损坏的处理措施.doc VIP
- 《铁血丹心》完美演奏版简谱钢琴谱 简谱双手数字完整版原版.pdf VIP
- 2025年高中数学_数列通项公式的求法教学设计学情分析教材分析课后反思.pdf VIP
- 海南省公安厅辅警真题.pdf
- 新人教版高中数学必修第一册第四章指数函数与对数函数全套PPT课件教案讲义.pptx
文档评论(0)