(参考)桥梁博士毕业设计电子版.docx

  1. 1、本文档共68页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
本科生毕业设计(论文) PAGE PAGE I 摘 要 这次毕业设计是针对西河大桥的四车道方案进行初步设计,结合桥址处的地质条件、设计基本要求与主要技术标准,拟定了等截面预应力混凝土简支变连续梁桥、连续T梁桥、简支板桥方案,经过桥型方案比选,最终选定等截面预应力混凝土简支变连续梁桥作为推荐方案,并对m等截面预应力混凝土简支变连续梁桥方案进行了详细设计。 通过查阅资料和参考相关成桥经验数据拟定主梁结构尺寸,利用桥梁博士V3.0对主梁结构进行一次成桥和施工成桥内力分析,根据分析结果进行估束,并经过配束、调束确定预应力钢束的数量与布置形式。根据配筋结果对主梁结构进行应力、内力计算组合和强度、抗裂验算,根据结果表明主梁结构满足设计要求。在设计过程中,按照设计要求同时进行工程图绘制。 关键词:预应力混凝土 简支变连续梁桥 结构设计 Abstract This graduation design of four-lane of the West River Bridge is presented in this paper. According to geological conditions in the bridge site, basic requirements of designing and principal technical standards, three bridge projects have been drawn up. The first program is the Section of prestressed concrete simply-supported into continuous girder bridge. The second program is the Continuous T beam bridge. The third program is Simply supported slab bridge. Ultimately, the Section of prestressed concrete simply-supported into continuous girder bridge is determined as the recommended project, and a detailed design is carried out on the project namedm the variable constant section prestressed concrete continuous beam bridge. Structure dimensions of main girder is drew up by resourcing and referring to the correlated experience data, and the internal force analysis of one time forming bridge and construction forming bridge of main girder is carried on by DoctorBridge V3.0. Quantity of prestress wire is estimated according to the analysis results, amount and layout types are fixed through distributing and adjusting prestress wire. Calculation of stress and internal force and checking of strength and crack-resistance are based on the distribution results, designing and computing of piers are based on the construction water level, and the results show that both main girder and substructure meet the designing requirements. Protacting of engineering drawings is progressed during the designing. Keyword: prestressed concrete a continuous girder bridge architectural design 目 录 TOC \o "1-3" \h \z \u

文档评论(0)

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档