- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Inerting
Pulverizer Inerting - Extracts from NFPA 85 2001 Edition
3.8.5.2.3 Normal Shutdown. The requirements in 3.8.5.2.3 shall apply to the removal of coal from service as the only main burner fuel being fired. The requirements in 3.8.5.2.7 shall apply to the removal of coal from service with other fuel remaining in service.
3.8.5.2.3.1 When taking the unit out of service, the boiler load shall be reduced to that necessitating a purge rate airflow using the procedures outlined in 3.8.5.2.3.2 and 3.8.5.2.3.3, while maintaining operation within the tested limits determined in 3.8.5.2.2.5. Prior to removing coal from service and prior to loss of reburn permissives, reburn fuel shall be shut down as defined in 3.6.5.2.9, 3.7.5.2.9, or 3.8.5.2.9.
3.8.5.2.3.2 A pulverized fuel system shall be shut down in the following sequence:
(1) The pulverizer’s fuel input, airflow, and register positions shall be adjusted to values established for start-up.
(2) Igniters shall be placed into service at these burners, when required to maintain flame stability.
(3) The hot primary air shall be shut off and the cold primary air shall be opened to cool down the pulverizer in accordance with Chapter 6.
(4) The feeder shall be stopped in accordance with the manufacturer’s recommendation. Operation of the pulverizer shall be continued with a predetermined airflow prescribed in an established operating procedure that has been proven to be sufficient to empty out the pulverizer and associated burner lines.
(5) The inerting medium shall be introduced into the pulverizer as dictated by the coal characteristics.
(6) The pulverizer subsystem shall be shut down when burner fires are out and the pulverizer is empty and cool.
(7) All individual burner line shutoff valves shall be closed unless otherwise directed by the manufacturer’s instructions.
(8) Igniters shall be removed from service.
3.8.5.2.3.3 As the fuel is reduced, the following procedures shall be followed:
(1) The remaining pulverizers shall b
您可能关注的文档
最近下载
- 初一育才期末数学试卷.docx VIP
- IEC60364554-2021(翻译稿)低压电气装置第554部分电气设备的选择和安装接地配置.pdf VIP
- 11水平五 高一 田径单元18课时计划-《田径:跨栏跑—跨栏步》教案.docx VIP
- 乌兰察布市2025年初中学业水平考试一分一段人数统计表.xlsx VIP
- 职业健康管理要求.docx VIP
- NOK骨架油封样本.pdf VIP
- NB_T 42088-2016继电保护信息系统子站技术规范.pdf
- 抗菌药物临床应用实行分级管理.ppt VIP
- 验房表格精装修详细版.doc VIP
- DB44_T 2746-2025 骨质疏松高风险人群中医健康管理指南.pdf VIP
原创力文档


文档评论(0)