- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
UniversityofNewHampshireCombinedHeat
University of New HampshireCombined Heat Power Project Why Build a Cogeneration Plant? By-products include low-cost heating and cooling More reliable More flexibile energy sources also apply to heating and cooling, not just electricity. Cleaner air 20 tons less nitrogen oxides emitted annually 200 tons less sulfur dioxide emitted annually 34,000 tons less carbon dioxide emitted annually University of New HampshireUtility Infrastructure Project Objectives Develop a Utility Plan to meet the steam, chilled water, and electricity needs of the campus through 2025 Design and construct utility infrastructure in 2005 that will meet the short term campus energy requirements in the most flexible and economic manner Assure that expansion of utility infrastructure allows UNH to meet long term energy requirements in the most economic manner Assure that new infrastructure build-out maximizes energy efficiency, so that future energy cost avoidance will pay for the capital costs of the equipment Components of UNH Utility Needs Heat (steam) Air Conditioning (chilled water) Electricity Steam Requirements for the Future The existing central heating plant has reached capacity. Remote boilers had to be installed at Holloway Commons in order to preserve system capacity for Kingsbury Existing equipment is aging Capital cost of adding future heating capacity: In 2005, to serve 2005-2009: $10 million In 2009, to serve 2009-2015: $3 million In 2015, to serve 2015-2025: $4 million TOTAL: $17 million needed for steam capacity Chilled Water Requirements for the Future Capital costs for local building chillers: College Road, 8 buildings: $9 million Horton, McConnell, Kingsbury, Morse, Parsons, Paul Arts, Philbrook, Spaulding James area, 7 buildings: $2.2 million Demeritt, James, Kendall, Morrill, Nesmith, NH Hall, Taylor TOTAL: $11.2 million needed for chilled water capacity Electrical Requirements for the Future Substations 1 2 are 40 years old Substation 3 will need replacemen
您可能关注的文档
最近下载
- 人教版二年级数学期末试卷.docx VIP
- 地铁疏散平台施工方案.docx VIP
- 2021中国智能家居生态发展白皮书.pptx VIP
- 中职人工智能技术应用专业人才培养模式的探索与实践报告.docx VIP
- 2025广西公需科目考试答案(3套,涵盖95_试题)一区两地一园一通道建设;人工智能时代的机遇与挑战.docx VIP
- 智能家居生态发展白皮书.pptx VIP
- 2018-2024年海峡杯数学竞赛真题及答案(三年级).pdf VIP
- 铁路线路防护栅栏(通线〔2023〕8001)下.docx VIP
- 范德堡法.doc VIP
- 2023-2024学年江苏省高中语文高三期末通关考试题详细答案和解析.docx VIP
文档评论(0)