- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
空预器安装说明书(英文)
Air Preheater Erection
Procedures Manual
(F031OYA001XXXX)
WRITTEN BY: CHEN GUOZHONG
CHECKED BY: WANG CHANGXIA
REVIEWED BY: JIANG SHUHAI
APPROVED BY:
CHIEF ENGINEER:
HARBIN BOILER COMPANY LIMITED
November 29, 2008
INDEX
1. General introductions…………………………………………. ……. 2
2. Field Erection Procedures for Modular Air Preheaters………… 2
2.1 Suggested Field Erection Sequence Summary…………………… 2
2.2 General Field Erection Guidelines for Modular
Air Preheaters………………………………………………………. 4
2.3 Field Erection Procedures for Modular Air Preheaters……… 6
3. Air Preheater erection procedure checklist………………………… 32
3.1 General Structure…………………………………………………... 32
3.2 Rotor…………………………………………………………………. 33
3.3 Support Bearing Assembly…………………………………………. 33
3.4 Guide Bearing Assembly…………………………………………… 34
3.5 Rotor Drive Assembly………………………………………………. 35
3.6 Hot End Sector Plate Assemblies………………………………….. 36
3.7 Cold End Sector Plate Assemblies………………………………… 37
3.8 Axial Seal Plate Assemblies………………………………………… 38
3.9 Hot and Cold Static Seal Assemblies……………………………… 38
3.10 Rotor Seal Assemblies…………………………………………….. 39
3.11 Rotor Stoppage Alarm Assembly………………………………… 40
3.12 Wash Pipe Assembly……………………………………………… 40
3.13 Fire Suppression System Assembly……………………………… 40
3.14 Soot Blower………………………………………………………… 41
3.15 Water Cooling System…………………………………………….. 41
3.16 Fire Detecting System……………………………………………... 42
3.17 Oil Temperature System…………………………………………. 42
General introductions
These instructions are mainly about generalized erection guide of Ljungstrom Air Preheater. Erector shall prepare the detailed Erection Procedures based on this manual and erection drawing according to the actual situation.
Refer to the related instructions for the stoppage alarm system, rotor drive and the controlling system, fire detection device, cleaning device, leakage control system and oil lubrication system for details.
Field Erection Procedures for Modular Air Preheaters
Suggested Field Erection Sequence Summary
您可能关注的文档
最近下载
- 智能客服:智能问答系统all.docx VIP
- HarmonyOS应用开发者高级认证答案.docx VIP
- 2025-2026学年小学心理健康南大版五年级-南大版教学设计合集.docx
- DB45T 2320-2021高等级公路环境风险防范措施及应急能力建设管理指南.docx VIP
- 神经外科手术并发症防治与处理解析与应用.docx VIP
- 园长开家长会PPT课件.pptx
- 外研版一年级起点七年级英语上册全套PPT课件.pptx
- NB_T 47013.7-2012 承压设备无损检测 第7部分目视检测.pdf VIP
- 人教版二年级上册数学全册教学设计(配2025年秋新版教材).docx
- 清洁能源技术课件PPT最新完整版本.pptx VIP
文档评论(0)