- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Unit6 隧道
Unit6 tunnels
11.One of the first major tunnels built through rock was the Mont Cenis Tunnel in the Alps between France and Italy. It is fourteen kilometers long and was built between 1857 and 1871. When construction began on it, progress was only twenty-two centimeters a day. Fortunately, the pneumatic drill, which uses compressed air to bore holes in rock, was invented a few years after construction began. Thereafter, the tunneling speed was increased to two meters a day. Like most tunnels, the Mont. Cenis was bored from two different headings, one in France and one in Italy, which met in the middle.
12.Another technique that has come into wide use in recent years is the immersed-tube system. In this technique a channel is dredged along the line of the tunnel, in other words, silt is pumped out of the waterbed. Piles are then driven along the channel, and prefabricated sections of the tunnel are lowered into place on to the piles. The tunnel sections are closed by temporary faces that are removed after all the sections have been assembled. The joins between the sections are also made watertight at this stage of construction. Finally, the channel is filled in to give the tunnel greater stability. The Maas River Tunnel at Rotterdam is an immersed tube. Another is the recently opened tube between San Francisco and Oakland, California
Before design and construction of a dam can begin, an extensive survey and study of the site must be made, This survey examines not only topographical features of the area, but also soil and rock samples to determine the geological factors that may affect it. The hydraulic features of the stream or river that is being dammed must also be determined ,such as the volume of flow of the river in different season. Engineers use this information to calculate potential water pressure. It is also necessary to study the site to see whether the dam can be constructed with the use of cofferdams or whether the flow of the river must be diverted. C
您可能关注的文档
最近下载
- 人教版二年级数学期末试卷.docx VIP
- 地铁疏散平台施工方案.docx VIP
- 2021中国智能家居生态发展白皮书.pptx VIP
- 中职人工智能技术应用专业人才培养模式的探索与实践报告.docx VIP
- 2025广西公需科目考试答案(3套,涵盖95_试题)一区两地一园一通道建设;人工智能时代的机遇与挑战.docx VIP
- 智能家居生态发展白皮书.pptx VIP
- 2018-2024年海峡杯数学竞赛真题及答案(三年级).pdf VIP
- 铁路线路防护栅栏(通线〔2023〕8001)下.docx VIP
- 范德堡法.doc VIP
- 2023-2024学年江苏省高中语文高三期末通关考试题详细答案和解析.docx VIP
文档评论(0)