- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Nuts and Bolts for Transitional Kindergarten Preparing Our
Standards Alignment and Pacing Guide Blending of Preschool Foundations and Kindergarten Standards Pacing guide for ELA and Math Assessments Nuts and Bolts for Transitional Kindergarten:Preparing Our Youngest Students toSucceed in Kindergarten Washington School Kingsburg Elementary Charter School District Mrs. Ying Lee- Transitional Kindergarten Teacher Mrs. Shirley Esau, Principal and Director of Categorical Programs * Inspiration – the youngest kindergarten students and a pioneering teacher * Kingsburg Kingsburg -12,000 people, located between Fresno and Visalia. Kingsburg Elementary Charter School District serves all the students in town – preschool through 8th grade. Largest Charter District in California ADA – 2500+ High student achievement – District API = 816 Transitional kindergarten students ride the bus just like kindergarten students. * Kingsburg Elementary Charter School District Washington School – preschool kindergarten: Title 1 Schoolwide Early Intervention preschool ( 30 students) State preschool (90 students) Transitional kindergarten (25 students) Kindergarten (243 students). Roosevelt School - first grade Lincoln School – second and third grades Reagan Elementary – fourth, fifth, sixth grades Rafer Johnson Junior High – seventh eighth grades Central Valley Home School – K-8 grades Island Community Day School – 4-8 grades * Kindergarten Readiness Act of 2010: SB 1381 The legislation SB 1381 creates transitional kindergarten, the first year of a two-year kindergarten experience for those students who are born between September and December. These children would have been in kindergarten if the law had not changed. Transitional kindergarten is proactive instead of retention being reactive. Both cases require the Continuance Form for each child and both are two year programs by default. Kingsburg’s Action Plan – 2009-11 Preschool to kindergarten Articulation plan with all public and private preschools. (2 year projec
您可能关注的文档
- L06J125.doc
- Lecture6 图形.ppt
- lecture two 1-2.ppt
- LED18红外感应日光灯规格书2.doc
- L49~50上课用.ppt
- lecture2-creating-parts(CH)_6.6.ppt
- Lesson 04-Part 2 Screw Threads Threaded Fastener and Locking Devices.ppt
- Lesson 13 Blueprint for success.ppt
- Less_17Monitoring and Resolving Lock Conflicts.ppt
- Let4-Recurrences.ppt
- 2024精简护肤洁面趋势报告-TMIC-30正式版.doc
- 2024捕捉华夏民族珍味-咸味主食与咸味零食创新机遇报告-25正式版.doc
- 2024年秋季部编版小学道德与法治二年级上册全册课件PPT最新.pptx
- 部编版第十一册第四单元拓展提高教学课件.ppt
- 2024年秋季新西师大版一年级上册数学全册教学课件(新版教材).pptx
- 2024年秋新人教版一年级上册数学全册教学课件(新版教材).pptx
- 2024年秋季新人教版数学一年级上册全册教学课件(新版教材).pptx
- 2024年秋季新人教版数学一年级上册全册课件(新版教材).pptx
- 2024年秋季新人教版一年级上册数学全册教学课件(新版教材).pptx
- 2024年秋季新人教版一年级上册数学全册课件(新版教材).pptx
最近下载
- 外研版(三起)四年级上册全册大单元整体教学设计.pdf VIP
- 高中物理串联电路和并联电路练习题.pdf VIP
- YY_T 0128-2023 医用诊断X射线辐射防护器具 装置及用具.docx
- 学习内容及学习者分析教学目标、重点、难点及解决措施教学.ppt VIP
- 《工艺展示样板及施工工序样板实施技术交底》(指引).pdf VIP
- 2023年唐山市中医医院护士招聘考试历年高频考点试题含答案解析.docx VIP
- 13J104蒸压加气混凝土砌块、板材构造.pdf VIP
- NB_T 47016-2023 承压设备产品焊接试件的力学性能.pdf
- 体外膜肺氧合(ECMO)规范化管理.pdf VIP
- 人教版(2024年新教材)九年级上册化学:第二单元2.1《我们周围的空气》教案教学设计.docx
文档评论(0)