Paralle Routing(平行Routing).docVIP

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Paralle Routing(平行Routing)

Parallel Routing Setting Date: 2008-12-23 Created by Jerry This documentation will illustrate how to set parallel routing operation in the BaaN V I Introduction In the BaaN V, the parallel routing operation can be carried out by adding phantom item into the BOM, please noted that you can only go this way to set the parallel routing operation in the BaaN V which we call it as Network Routing Operation. II How to setting Parallel Routing Operation In order to understand this way clearly we will build a BOM as below for example: Item Code Type Phantom UOM JERRY-TEST-FG1 M N 1 JERRY-TEST-Q3 P N 1 JERRY-TEST-Q4 P N 1 JERRY-TEST-Q1 P N 1 JERRY-TEST-Q2 P N 1 The routing operation as below: Operation Description Production Rate(/hour) Cycle Time (min) Next Operation Operation10 Pre-Assembly 1 60 Parallel 40 Operation20 Punching 3 20 30 Operation30 Bending 1.2 50 40 Operation40 Assembly 1 60 - Actually this is a single level BOM if we did not consider the parallel routing operation 10 and 20, for set them as parallel processing, we need to create two phantom items to cut this single operation line as two different lines, so the BOM should be modified as below: Item Code Type Phantom UOM JERRY-TEST-FG1 M N 1 JERRY-TEST-WIP1 M Y 1 JERRY-TEST-WIP2 M Y 1 JERRY-TEST-Q1 P N 1 JERRY-TEST-Q2 P N 1 JERRY-TEST-Q3 P N 1 After build this BOM in the system, we also need to build the routing operation for this two phantom manufactured parts. And for FG we have: Then we can create a production order for item JERRY-TEST-FG1: After calculated by system, the requested delivery date is at 16:23 on 23-12-08 based on the start date and the planning method. You can calculate by yourself to check this result which should be read from the operation duration as 60min+(20min+50min) or you can see as 60+60+10, remember that we have a parallel operation happened at operation 10 an

文档评论(0)

cj80011 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档