网站大量收购独家精品文档,联系QQ:2885784924

某国330kv线路施工组织设计说明—-施工组织设计.docVIP

某国330kv线路施工组织设计说明—-施工组织设计.doc

  1. 1、本文档共48页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
某国330kv线路施工组织设计说明—-施工组织设计.doc

EPC of ABC 330kV D/C TRANSMISSION LINE PROJECT Construction Management Plan ABC Co., Ltd April 5,2010 Prepared: Checked: Approved: Chapter 1 Project Overview and Features 1. Project overview and features 1.1 project overview Lot 1 330kV - B DC Line ( that is 286m in length ) ( hereinafter referred to as “AB Project”) is a project invested by NDPHC. 1.1.1 Length, voltage grade and erection type of the line ABProject is located in the central area of N NATIONAL starting from A Substation in the south and ending in B substation in the north with the length of 279.449km. The project is located above sea level between 100m and 1300m with the voltage grade of 330kV. The double-circuit line will be erected on the same tower and self-supporting angle steel towers will be employed for the line. 1.1.2 Conductor, ground wire, OPGW and insulator The conductor will be twin bundled and horizontally arranged with the model of BISON. The ground wires will be GJ-60 galvanized stranded wire and OPGW respectively. Glass insulators will be employed for the line. Twenty FC120/146 glass insulators will be employed in the tangent tower and 2X22 FC160/146 glass insulators in the strain tower. 1.1.3 Fountation type and earthing Oblique Angle Inserted Foundation and horizontally radial earthing. 1.2 Analysis of construction condition 1.2.1 Construction condition at the site ● Medium sand, crushed stone resources are available along the line. Appropriate sand, stones may be provided. ● Influenced by climatic conditions, it is difficult to construct in rainy season at location of this project. Rainy season should be evaded as far as possible. However, since part of construction period for this project is arranged in rainy season. Preparations should be made for the construction proposal in rainy season. Construction period of the procedures should be arranged reasonably. Adverse factors should be considered suffi

您可能关注的文档

文档评论(0)

六神无主 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档