Oracle 1G Client 客户端安装步骤.docVIP

  • 1
  • 0
  • 约5.33千字
  • 约 8页
  • 2016-09-30 发布于浙江
  • 举报
Oracle 1G Client 客户端安装步骤

Oracle 11G Client 客户端安装步骤(图文详解) /jiguixin/archive/2011/09/09/2172672.html 下载地址: /otn/nt/oracle11g/112010/win32_11gR2_client.zip 先将下载下来的ZIP文件解压,并运行setup.exe文件。 执行到第四步之后,出现错误,直接点全部忽略就可以了。 把上面的步骤执行完了,那么就该等待ORACLE的安装了。 现在这个就搞定了。 the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes the oil level to the normal oil level. (2) for the secondary pr

文档评论(0)

1亿VIP精品文档

相关文档