在控制面板隐藏个软件的卸载.docVIP

  • 7
  • 0
  • 约5.71千字
  • 约 5页
  • 2017-03-09 发布于贵州
  • 举报
在控制面板隐藏个软件的卸载

【在控制面板隐藏一个软件的卸载】 运行运行regedit “添加/删除”程序的信息位于HKEY_LOCAL_MACHINE 3. SOFTWARE 4.Microsoft 5. Windows 6. CurrentVersion 7. Uninstall 8. 一般每个程序都有一个注册表项,你可以点开某一项,查看“DisplayName”的值来判断它是哪个程序的注册表项,另外有一些程序是直接通过注册表项可以看出来的。 9. 比如HKEY_LOCAL_MACHINE\SOFTWARE\Microsoft\Windows\CurrentVersion\Uninstall\QQ拼音这项就是QQ拼音的卸载程序信息。 10.右键点击导出(以后想卸载的时候再把注册表导入就行) 11.右键点击删除 大功告成 看看效果吧 没删QQ拼音注册表之前 删了QQ拼音注册表之后 本稿为原创,如有它用,请注明出处 谢谢合作 Ellipticity of elbow pipes with diameters less than or equal to 150 mm must be not greater than 8% diameter of 200 mm or less shall not be greater than 6%. Wall thickness of the pipe wall thinning rate must not exceed the original 15%. Crease roughness: diameter 125 mm or less, shall not exceed 3 mm diameter less than or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1 hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2 supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3 pipe supports and h

文档评论(0)

1亿VIP精品文档

相关文档