- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
fidic施工合同下缺陷通知期内业主的索赔研究__本科毕业设计.doc
99版FIDIC施工合同下缺陷通知期内
业主的索赔研究
摘要
随着中国建筑市场的国际化,国外承包商广泛地参与到国内建筑项目中。由于涉外工程项目建设周期长、施工情况复杂,承包商难免在施工中出现失误,给业主造成经济损失。缺陷通知期是99版FIDIC合同中工程接收证书颁发后承包商对工程进行质量保修的时期,业主有权在此期间内对由承包商原因造成的质量缺陷进行索赔。因此,对于缺陷通知期内业主索赔的研究是富有现实意义的。对FIDIC合同条件下业主索赔研究Research on Employers Claims during Defects Notification Period under Conditions of Contract for Construction (FIDIC 99)
ABSTRACT
With the internationalization of the Chinese construction market, the foreign contractor is extensively involved in the domestic construction projects. Because the international project has a long construction period and the situation of construction is complicated, Contractor will inevitably make mistakes during the period of construction, which causes economic losses to Employer. Defects Notification Period is Contractor’s quality warranty period on construction under Conditions of Contract for Construction (FIDIC 99) after project receiving certification is issued, during which the Employer have the right to claim on quality defects caused by Contractor. Therefore, research on Employer’s claim is full of practical significance during the defects notification period.
From employer’s view, this paper researches on Employers Claims during Defects Notification Period under Conditions of Contract for Construction (FIDIC 99) from the following aspects:
Firstly, this paper researches on Defects Liability Division during the Defects Notification Period. Through literature analysis, this paper finds out the employer’s claim matter in Defects Notification Period. Through risk allocation and case analysis, this paper analyse defects liability between employer and contractor.
Secondly, this paper researches on the content and process of claim during Defects Notification Period. Through the analysis of claim basis during the Defects Notification Period, this paper finds out the claims’ contents, then analyses the content and process of claims which appear the quality problems and failure to remedy defects in Defects Notificat
您可能关注的文档
- 115立方米卧式液化石油气储罐设计__本科毕业设计.doc
- 120万吨球团项目谋划书__本科毕业设计.doc
- 130i型电刷级进模设计__本科毕业设计.doc
- 220kv北关一次降压变电所继电保护电气部分-初步设计__本科毕业设计.doc
- 220kv降压变电站电气设计开题报告及外文翻译__本科毕业设计.doc
- 250k屋顶光伏并网发电系统技术方案防逆流__本科毕业设计.doc
- 400万吨年水泥粉磨站工程熟料储存及输送本体降排水深基坑支护施工方案报告书__本科毕业设计.doc
- 600mw火电机组燃煤锅炉的本体设计__本科毕业设计.doc
- 660mw火力发电主接线设计__本科毕业设计.doc
- 800万吨年混合原油常减压蒸装置设计__本科毕业设计.doc
文档评论(0)