- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
硬笔书法之钢笔书28种基本笔画练习法
转载】硬笔书法之钢笔楷书28种基本笔画练习法
?
and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld
您可能关注的文档
- 石膏几何体素描案10.24—10.28.doc
- 石英砂简介&堆比重.doc
- 矿井WMN多媒应急通信系统多跳传输性能改进.doc
- 矿井主提升系统理规定.doc
- 矿井安全救灾的感器网络系统.docx
- 矿井提升系统安技术规范 Word 文档.doc
- 矿井提升机械设选型.doc
- 矿井瓦斯抽采管计量监控系统现状研究与分析.doc
- 矿井运输与提升备题库及答案.doc
- 矿井通风与安全业论文赵彦怀.doc
- 2025年征信行业发展趋势及征信考试题库试题.docx
- 2025年中学教师资格《综合素质》学生心理辅导案例分析题库.docx
- 2025年三支一扶考试公共基础知识真题模拟及试卷(山东).docx
- 2025年健身教练职业技能考核试卷:健身教练运动心理学与心理辅导实战演练.docx
- 2025年征信考试题库:征信行业变革与.docx
- 2025年辅导员岗位竞聘考试:大学生就业实习实训与评价题库.docx
- 2025年数字合成师考试:影视后期制作技能实战试卷.docx
- (一模)温州市普通高中2026届高三第一次适应性考试 地理试卷(含答案).docx
- (一模)温州市普通高中2026届高三第一次适应性考试 英语试卷(含答案).docx
- (一调)枣庄市2026届高三第一学期质量检测 历史试题(含答案).docx
文档评论(0)