中山大学200年口腔综合考研试题.docVIP

  • 4
  • 0
  • 约5.92千字
  • 约 5页
  • 2016-10-10 发布于广东
  • 举报
中山大学200年口腔综合考研试题

中山大学2003年口腔综合考研试题   coupling Centre shall be checked, the second poured concrete strength of more than 70%. In the process of reaming or boring, apart from the special provisions in factory, does not allow any work that may affect the coupling Centre, such as irrigation, to cylinder connections to flood the condenser pipes and so on. Well boring, hinge bolt hole flange with coupling of vertical, not oblique. Mounting bolts should be added lubricants, typing gently with a small hammer, not too loose or too tight, packed the bolts with the corresponding seal screw hole shoul

文档评论(0)

1亿VIP精品文档

相关文档