- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Design Project – Initial Design and TimelineGoals
CENG 3311 - Fall 2006
Design Project - Final ReportLab for Telecom and Networks
Discrete Component Implementation
Team Alpha:
Scot Smith
Tom Ives
Chris Chow
Thu Nguyen
George Tanev
Mushtaq Mohammed
Table of Contents
I. Team Members: 2
II. Project Overview: 2
1. Preliminary System Design: 2
2. System Design Overview: 2
3. Hardware: 2
Anticipated components 2
Components we actually used: 3
III. Timeline 3
IV. Process 4
1. Transmitter 4
Temperature Sensor (LM34) 4
ADC (ADC0804) 4
Clock (4800Hz) 4
UART (AY-5-1013A) 5
Line Receiver (MC1489) 5
2. Receiver 6
V. Results: 7
VI. Cost Analysis: 8
VII. Conclusions: 8
Design Project – Final Report
Lab for Telecom and Networks – Fall 2006
Team Members:
Scot Smith
Tom Ives
Chris Chow
Thu Nguyen
George Tanev
Mushtaq Mohammed
Project Overview:
Preliminary System Design:
System Design Overview:
Our device is a remote temperature sensor that senses the temperature and sends the results to the PC. To accomplish this, an ADC is used to convert the analog signal from the LM34 Temperature Sensor to an 8 bit binary signal, which is then converted by a UART into serial data steam in TTL format. A TTL to RS232 signal conversion is performed by a MC1489 Monolithic quad line receiver before the signal is sent to the PC.
Hardware:
Anticipated components
Components we actually used:
1 Temperature Sensor – LM34DZ
1 Analog to Digital converter – ADC0804
2 UART – AY 5 1013A
2 Breadboards
Wiring
1 Capacitor (0.47 uF)
1 Resistors (10k O)
LEDs
[Tom’s Clock stuff]
Timeline
Oct 24 Oct 31 Nov 07 Nov 14 Nov 21 Nov 28 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Divide into Groups Examine previous designs in depth Troubleshoot the data connection Continue troubleshoot the data connection Finalize Implementation Present Report to class. Assigned Teams Prototype current design Connected outside source to the project Clean the wiring on the circuit Consolidate Reports Preliminary System Design Document Activiti
您可能关注的文档
- CSS3 是对CSS 规范的一个很大的改善和增强,它使得Web 开发人员.doc
- 进誎论教育共勉.docx
- CS架构解决方案.doc
- 进货检验规范(板膜)作业指导书.doc
- 进补膏滋五大误区,快看看中招没.docx
- 进货订货作业.doc
- 进路由器有的网页打不开.doc
- 进销存+标准财务管理.doc
- 进销存与应收应付.docx
- 进销存管理系统2.doc
- Design of a Wind Tunnel Facility for Hands.DOC
- destoon 50文章模型接口使用手册 .doc
- Design of a Mechanical Model for Pulsatile Aortic Flow.doc
- 远程登陆操作步骤.doc
- 远红外线辐射陶瓷板资料.doc
- 远足活动促进幼儿全面发展.doc
- Determination of clay crystallite thickness distributions by XRD, and.doc
- Determination of Biochemical Oxygen Demand .doc
- 远距离液位监测实验.doc
- Determination of Iron in Water.doc
文档评论(0)