江西师大教育硕专业方向介绍.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
江西师大教育硕专业方向介绍

江西师大全日制教育硕士专业方向介绍 2015年江西师大全日制教育硕士学费共计1.6万元,学制两年。 江西师大全日制教育硕士专业初试科目如下: 现代教育技术 招生人数5人 ①101思想政治理论②204英语二 ③333教育综合④833教育技术学 心理健康教育 招生人数5人 ①101思想政治理论②204英语二 ③333教育综合④834心理健康教育 学科教学(音乐) 招生人数10人 ①101思想政治理论②204英语二 ③333教育综合④830多声部音乐分析 素描、色彩 the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understan

文档评论(0)

vdi938 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档