- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Annual report for reso
ENCO ME Technology Co., LTD * ENCO ENCO P1 ENCO ME Technology Co., LTD ENCO Agenda : Executive Summary for Q4 2005 Facilities system overview Operation status and Preventive maintenance Utilities consumption Incidents Key issues review Help Desk Cleaning work Training Team building Work Plan for Q1 2006 Continuing improvement Plan for system management Business condition review Question and answer QUARTERLY BUSINESS REVIEW P2 ENCO ME Technology Co., LTD ENCO 1.a) Facilities system overview QUARTERLY BUSINESS REVIEW The floating valve for water input in the fire water reservior,there is a malfunction ,now control manually . it will be repaired in Spring Festival . Water supply drainage All the key data can be kept in control limit . The limit switch for the drainage is out of control, need to replace DI/UDI One set of PV pump is sent to repair in Shanghai, the target return date is Jan 18 2006. Vacuum TOC out of Specification(10ppb); Material Lab takes Responsible to fix the issue CDA The city power supply HV line 1 is unstable ,it cut off on Dec 30 2006 The distribution panel board are dusty, need to be cleaned in Spring Festival. Power supply All the key data can be kept in control limit . Due to low control speed on the FFU monitoring software ,it cause impact on the control to all FFU during input data status feedback, this problem has been added into the punch list. Cleanroom Status The main machine run normally , need pipe flushing in Spring festival. Chiller The cooling water is still dirty ,it will need to be changed with clean water. It will be done in Spring Festival by vendor. Cooling Tower Description System System out of spec. Affected user, under control normal function P3 ENCO ME Technology Co., LTD ENCO 1.a) Facility system overview QUARTERLY BUSINESS REVIEW The running status is normal, the handover to HGSP will be in Jan 2006. IWWT The water Leakage testing should be arranged in Q1 2006,before
您可能关注的文档
- 95年1月TOEFL语法讲解.doc
- 97年化工原理期末考试题.doc
- A Bundle of Assertions.ppt
- A general limit equilibrium model for thre1.doc
- A LIFE CYCLE APPROACH TO MANAGINGELECTRICAL & ELECTRONIC EQUIPMENT (EEE).ppt
- A theory of firm scope.ppt
- A new kind of electro-active polymer composite composed of silicone elastomer and.docx
- abnormal_psychology_.pptx
- about china-Environment.doc
- About Chinese Visa.doc
文档评论(0)