Completion of the lime soil curing - 副本.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Completion of the lime soil curing - 副本

Completion of the lime soil curing, at least a week, all the time in curing period, should keep it in the wet state. Room temperature season sprinkler maintenance, should not be less than 4 times a day, should not be too wet or dry and wet. During maintenance, the lime soil in addition to the sprinkler, no other vehicle is on the maintenance after only allow for construction needs to open to traffic in the lime soil, but must strengthen management, should limit the speed should not exceed 30 km/h, caterpillar vehicles is forbidden. In construction of calcareous soil layers, the lower after the lime soil compaction, immediately on the shop for another layer of lime soil, soil, and do not need specialized raise construction lofting straight segment every 15 ~ 20 m set one pile, flat curve set a period of 10 ~ 15 m, and on the edge of the shoulder on both sides of the peripherals indication piles, the obvious mark on indication piles lime soil base on the edge of the design elevation. 9) the rain period construction The project construction period in case of rain, on schedule to shorten the construction front, shop, shop grey, mixing, paving and compaction process to join compact, do on the day of survival, in order to prevent rain water. For the lime soil is soaked by water, check the moisture content before leveling. Such as water content is too big, to fold air to achieve the best water content, to continue the construction. (2) 15 cm5 % cement stabilized gravel base Factory in central station on the base of the cement stable macadam mixture mixing method, with 300 t/h stabilized soil mixing plant. Construction requirements are as follows: 1) material Cement: adopt composite Portland cement, final setting time is longer, label low cement (32.5). Crushed aggregate: ≯ 30%, maximum particle size of 31.5 mm ≯ empty screen (party), the needle flake content ≯ 15%. 2) mixing Mixture to under the condition of optimum water content and maximum dry density, before

文档评论(0)

me54545 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档