Contractin enterprises shall establish and improve the system of assessment of project cost.doc
- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Contractin enterprises shall establish and improve the system of assessment of project cost
Contracting enterprises shall establish and improve the system of assessment of project cost, as a part of the project cost management responsibility system. Appraisal system, the purpose of dealing with the inspection time, scope, object, way, basis, index, organization, leadership, and the conclusion and the principle of rewards and punishments, etc to make that clear.
1 h420103 construction cost analysis of the plan
Cost analysis is an important part of the cost management, its action is the correct evaluation of enterprise cost plan execution as a result, the cause of cost changes in lift are, for the preparation of cost plan and provide important basis for business decisions. The main topic is: this article the basic method of cost analysis; Comprehensive cost analysis.
One, the basic method of cost analysis
(a) comparison
Comparison method is also called the comparison analytic method, it is through comparing technical and economic indicators, check the target completion, analyze the reasons of the differences, then the method to excavate internal potential. The application of comparative method, usually has the following form:
1. The current actual index and target index contrast.
2. Will this actual indicators compared with actual value of the previous period.
3. The current actual index compared with the industry average level, advanced level.
(2) the factor analysis method
Factor analysis method is also called serial displacement method. This method can be used to analyze the influence of various factors on the cost. In carries on the analysis, the first to assume that a factor has changed in many factors, other factors are constant, a factor in the changes on the basis of the analysis of the second factor changes, and then replace them one by one, compare the calculated results, respectively, to determine the influence degree of the change on the cost of each factor. On the basis of evaluate the enterprises cost plan implementation, improvement
您可能关注的文档
- Ch-2-TransissionLine.doc
- Chapter 1 he Nature of Translation.doc
- Chapter 1 hy China Works.doc
- Chapter 1 omputer Networks and the Internet.doc
- chapter 1 or students.doc
- Chapter 1 国部分.doc
- Chapter 10 Reconstitution and Expansion.doc
- CDMA网优过程中的话分析和处理.doc
- CHAPTER 10Dynamics of Rotational Motion.doc
- Chapter 22Practice Materials.doc
- 2024年中国钽材市场调查研究报告.docx
- 2024年中国不锈钢清洗车市场调查研究报告.docx
- 2024年中国分类垃圾箱市场调查研究报告.docx
- 2024年中国水气电磁阀市场调查研究报告.docx
- 2024年中国绿藻片市场调查研究报告.docx
- 2010-2023历年初中毕业升学考试(青海西宁卷)数学(带解析).docx
- 2010-2023历年福建厦门高一下学期质量检测地理卷.docx
- 2010-2023历年初中数学单元提优测试卷公式法(带解析).docx
- 2010-2023历年初中毕业升学考试(山东德州卷)化学(带解析).docx
- 2010-2023历年初中毕业升学考试(四川省泸州卷)化学(带解析).docx
文档评论(0)