Engineerin contracting commitment.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Engineerin contracting commitment

Engineering contracting commitment A, engineering quality commitment: Reach the qualified standard of national acceptance standards. Second, the construction period commitment: Program start date: on September 26, 2015; Project completion date: on October 26, 2015 Three, building the guiding ideology of this project: Adequately responding to the requirements of the tender documents, give full play to my company \sophisticated technology, strict management, good to fight\ the advantage of relying on excellent management personnel, the modernization of technical equipment and quality management system, measurement management system, environmental management system, occupational health and safety management system, strengthen the construction site management, implement the project law construction, guarantee the engineering quality, full use of its advanced construction technology, the economy is applicable within the given time limit for a project, with the optimization of the manpower resource, finish, and civilized construction and quality services. Four, measures to guarantee construction progress goals (1) our company will set up headquarters in the project, assigned with similar engineering experience and strong ability of comprehensive technology of all kinds of professional project intends to. (2) in a timely manner according to the requirements of the construction organization construction personnel enter the arena, coordination and dispatching work, completes the labor workforce that meet the needs of the construction progress. (3) establish rapport with the local administrative departments, obtain their support and help, reduce interference, ensure the smooth progress of construction. (4) strict and careful process management, achieves a superior, put an end to rework. Five, the measures to guarantee construction quality target (1) clear quality objectives and responsibilities to the project manager for the first. (2) to carry out \to strengthe

文档评论(0)

bguarfan + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档