- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
for enginering implementation
for engineering implementation;Company engineering technique the department provide technique support, the after-sales service department provides an after-sales service.
Personnels structure is as follows:
9.2The job divides the line
9.2.1Supervisor manager
For the engineering of our company total representative director, be responsible for each eyes total moderate, make sure that the item manages an operation method and creates good external environment for construction.
9.2.2Item management Dept.
Be responsible for each eyes to moderate a managing, include and company each professional in the inner part and cooperation between the sections, promise that the construction is used a material of the organization supply, technique support and quality in time the safety inspect smoothly developing of etc., periodically make collective report to the supervisor manager, promise the effective control to the engineering quality, safe progress.
9.2.3The manager of the item
Be responsible for the performance of the contract of the spot, press the item work project to return item funds, with the spot item the everyone moderate to manage a work.Is the direct representative director of engineering quality, communicate an information with supervisor manager in time, solution starts construction various problem in the process.
9.2.4Start construction supervisor
Be responsible for the manager of item, be responsible for various under construction problem on the scene, the reasonable arrangement dispenses manpower, material resources and organize engineering each work of plan and implementation, to the progress, quality, safety etc. control completely.
9.2.5The supervisor of the technique
Be responsible for item in any technique problem for appearing.
9.2.6Finance
The cost of the item checks.
9.2.7Budget
Engineering item all, examining of budget, and finishing construction of engineering final accounts.
9.2.8Engineering technique department
The engineering whole stageses support
您可能关注的文档
- ES - SIMATC Manager -- 项目操作 -- 编译,装载OS.doc
- ESSAY和Dissrtation写作常用词汇与表达方式.doc
- essay--huner5.doc
- Essence ofEducation.doc
- EU GMP第六章节量控制- quality control 翻译.doc
- EUROPEAN SVEREIGN DEBT CRSIS.doc
- EVA价值管理在中小业中的应用分析.doc
- Evid BasedComplement Alternat Med.doc
- Everybody s happy as his pay rises.doc
- Exercise hapter 2中英对照.doc
最近下载
- (100分)中国石油大学2022秋《红楼梦研究第二阶段在线作业.doc VIP
- 第7节货场平面布置及配置图.PDF VIP
- 8.1功与功率 (教学课件)-高中物理人教版(2019)必修第二册 .pptx VIP
- 海浦蒙特MTCC-V2A经典系列别墅电梯控制柜用户手册-中-V1.0.pdf VIP
- 塔里木油田超深气井产出剖面解释方法研究.pdf
- 2025年上海市青少年活动中心(上海市青年发展服务中心)工作人员公开招聘(第二批)笔试备考题库及答案解析.docx VIP
- 2025北京市公安局公共交通安全保卫总队勤务辅警招聘70人笔试备考试题及答案解析.docx VIP
- BRCGS 包装材料(第七版)文件清单.xlsx VIP
- 生物多样性保护与监测.pdf VIP
- 《探寻非遗漆扇之美》课件.pptx VIP
文档评论(0)